Information
Preliminary Information
-
Site:
-
SP No.
-
Conducted on
-
Client:
- Anglian Water
- Independent
- Scottish Water
- Severn Trent
- South West
- Southern Water
- Thames Water
- Welsh Water
- Wessex Water
- Yorkshire Water
-
Prepared by
-
Location
-
Personnel:
- John Gartside
- John Creamer
- Steve Pearce
- Ray Lewis
- Paul Rollinson
- Mike Greenman
- Tim Harrison
- Richard Malsom
- David Freeman
- Mitch Bunclark
- Mark Ward
- Gary Deaville
- Mark Burgess
- Mike Pritchard
Section B: Checklist
Section B- Data to be obtained/verified
-
1: Are there any special Health and Safety requirements associated with this site that we should be aware of? If YES provide details and ensure these are referenced on our RAMS
-
Further details:
-
2: Is the are we will be working in a confined space? If YES provide details
-
3: Is there power supply to the equipment?
-
-
4: Have you taken photographs?
-
5: Are there other people working on site?
-
6: Are there rubbish collection facilities ie skips, bins etc
Section C: Checklist
-
1: Is there safe Access/Egress to the work area?
-
Details of hazard(s) and what we propose to do about it
-
2: Is there safe storage of materials available?
-
Details of hazard(s) and what we propose to do about it
-
3: Is there adequate supervision and control of work?
-
Details of hazard(s) and what we propose to do about it
-
4: Is the atmosphere unhealthy or dangerous? ie gases, spray etc
-
Details of hazard(s) and what we propose to do about it
-
5: Is there adequate lighting?
-
Details of hazard(s) and what we propose to do about it
-
6: Do we have access to shelter, welfare facilities or mess rooms?
-
Details
-
7: Do we have access to toilet facilities?
-
Details
-
8: Do we have access to water and washing facilities?
-
Details of hazard(s) and what we propose to do about it
-
9: Can we comply with the Method Statement?
-
Reasons why not and any precautions we must take.
-
10: Is the flooring complete? Are access stairs etc safe to use?
-
Reasons why not and any precautions we must take.
-
11: Is there any scaffolding or working at height?
-
Details of hazard(s) and what we propose to do about it
-
12: Have we permission to use existing lift facilities and are they tested and checked?
-
Details of hazard(s) and what we propose to do about it
-
13: Is the electrical equipment (110v or lower) tested?
-
Details of hazard(s) and what we propose to do about it
-
14: Do we have all the PPE required to do the job safely?
-
Details of hazard(s) and what we propose to do about it
-
15: Do we have the correct first aid kit and the training to use it?
-
Details of hazard(s) and what we propose to do about it
-
16: Do we comply with the site safety plan?
-
Details of hazard(s) and what we propose to do about it
-
17: Do we have fire extinguishers available?
-
Details of hazard(s) and what we propose to do about it
-
Are we happy that the site is safe to work on?
-
Add signature