Title Page
-
Site
-
Conducted on
-
Prepared by
-
Carpenter name
-
Photo of facade
-
Location
Inspection
-
Frame approved
-
What are the outstanding items
-
All walls straightened
-
Packers adequately nailed off
-
Wall junctions nailed off and plumb
-
Meter box brackets removed and box supported top and bottom
-
Ceiling lines checked at wall lines
-
Bulkheads level and parallel to ceiling
-
Rangehood noggins installed
-
Garage door noggins installed
-
Columns straight/square
-
Packer installed to skirting line of small walls
-
Bath hob built to correct size and level
-
Bath installed and connected
-
When is install booked
-
Packer installed to back of shower niche for adequate fall
-
Noggins installed for all towel rails, toilet roll holders etc
-
Studs marked on floor
-
Roof free from broken tiles or possible leak issues
-
Plumbing rough in complete
-
When is it due for completion?
-
Are all shower/bath mixers/outlets in correct location?
-
Electrical rough in complete
-
Is all external cabling pulled through wall wrap at correct heights
-
Cabling will not interfere with downpipes
-
When is it booked for?
-
Alarm system rough in complete
-
Wall batts installed
-
Date booked
-
Plaster start date
-
House swept out and all rubbish placed in bins
-
Any other items of concern
SIGNATURES
-
Site Supervisor