Information
-
Location:
-
Builder
- Metricon
- P&J Constructions
- Botanic Homes
- Sunland
- Sperway
-
Job No
-
Start date
-
Inspected on
-
OHS Pack onsite
Please complete this pre - plaster inspection accurately.
-
1. Site access clear
-
2. Power / Water
-
3. Brickwork completed.
-
4. Job swept out.
-
5. Alfresco / Porches are levelled.
-
6. Ceiling noggins & perimeter of garage / porch / alfresco trimmed out.
-
7. Insulation installed.
-
8. Roof covered / flashing / gables complete.
-
9. Man hole marked.
-
10. Carpenter lock up complete.
-
11. Plumbers rough in complete.
-
12. Electricians rough in complete.
-
13. Ducted heating complete.
-
14. Metre box installed correctly.
-
15. Shower bases / baths installed and not damaged.
-
16. No protrusions beams / brackets / scaffolding.
-
17. QA frame inspection passed.
-
18. Check load ( if delivered)
-
19. Check sheets in wet areas.
-
20. Reveals / Niches marked.
-
Comments:
-
NB: If any actions are required, please discuss with the builders supervisor in charge, agree on a solution, the person responsible and rebook on a new Start Date.
-
Inspected By:
-
Signature:
-
Non Compliance / Corrective Action Required
-
ETS No
-
Please take note:
* Pre-plaster inspection will be carried out 5 days prior to Start Date. An inspection report/email will be forwarded to you (the Builder) that day of inspection.
* The Builder will have 48 hours prior to the Start Date to rectify any issues itemised on the inspection report/email.
* Confirmation by the Builder that all issues have been rectified must be received by us 24 hours prior to Start Date. eg. by We'd 5:00pm for Friday Start Date.
* PLEASE NOTE: If issues have not been rectified (ie. 100% ready for plaster), the job WILL be delayed to start 5 working days thereafter.
Should you have any queries, please contact your Caprice Plaster Supervisor.