1. Pre-start discussion held with crews - highlight topic in the comment section.
-
2. Communication of previous shifts hazards - highlight topic in the comment section.
-
3. All work area light vehicle pre-starts completed and submitted for work area.
-
4. Authorized dig plans in place and adhered to.
-
5. Are there interaction issues with other departments. - if Yes enter in comments
-
6. Are Positive Communication being used.
-
7. Instructions or comments from OCE's
Crib Hut
-
8. Area free of trip hazards.
-
9. Area free of rubbish and debris.
-
10. Sufficient lighting for Nightshift operations.
Go-Lines
-
11. All signage in place.
-
12. Sufficient lighting for Nightshift operations.
-
13. Park bays free of water & trip hazards.
Haul Roads and Ramps
-
14. Entry signage and traffic signage in place and maintained.
-
15. Road to the correct width (Minimum CAT 785 -24m, 789 -27m, 793/830 -30m)
-
16. Haul roads maintained and in good order.
-
17. Comer cambers in place and center bunding on downhill high-speed corners.
-
18. Delineators every 100 meters.
-
19. Suitable road sheeting applied and adequate.
Bench and Loading Area
-
20. Excavation area provides enough space to operate safely.
-
21. Compliant to dig face and batter plan designs.
-
22. Dig face less than cab height on excavators.
-
23. Crest Line free of rocks and hazards.
-
24. High wall and dig face bunding in place.
-
25. High wall cracking or water issues evident.
-
26. Was bunding removed from active dig area during shift?
-
If yes, was authorization sought from area Supervisor prior to removal and was bunding replaced?
-
27. Night shift lighting is adequate
-
28. Lighting plants have the appropriate bunding in place.
-
29. Designated light vehicle park up area has been established and maintained.
Dump Area
-
30. Area dump heights no more than 20 meters?
-
Is a JSA in place?
-
31. Dump area is free of cracks and drainage controls in place?
-
32. Access to the toe of all dumps are bunded off to all traffic.
-
33. Is water present at the toe of the dump and if so, is dumping short and dozing occurring under a JSA?
-
34. Compliant to dump plan designs.
Completion
-
General Notes/Comments
-
Supervisor
-
Crew
-
Superintendent