Title Page

  • Site

  • Conducted on

  • Prepared by

  • Location

HSEC

  • 1. Pre-start discussion held with crews - highlight topic in the comment section.

  • 2. Communication of previous shifts hazards - highlight topic in the comment section.

  • 3. All work area light vehicle pre-starts completed and submitted for work area.

  • 4. Authorized dig plans in place and adhered to.

  • 5. Are there interaction issues with other departments. - if Yes enter in comments

  • 6. Are Positive Communication being used.

  • 7. Instructions or comments from OCE's

Crib Hut

  • 8. Area free of trip hazards.

  • 9. Area free of rubbish and debris.

  • 10. Sufficient lighting for Nightshift operations.

Go-Lines

  • 11. All signage in place.

  • 12. Sufficient lighting for Nightshift operations.

  • 13. Park bays free of water & trip hazards.

Haul Roads and Ramps

  • 14. Entry signage and traffic signage in place and maintained.

  • 15. Road to the correct width (Minimum CAT 785 -24m, 789 -27m, 793/830 -30m)

  • 16. Haul roads maintained and in good order.

  • 17. Comer cambers in place and center bunding on downhill high-speed corners.

  • 18. Delineators every 100 meters.

  • 19. Suitable road sheeting applied and adequate.

Bench and Loading Area

  • 20. Excavation area provides enough space to operate safely.

  • 21. Compliant to dig face and batter plan designs.

  • 22. Dig face less than cab height on excavators.

  • 23. Crest Line free of rocks and hazards.

  • 24. High wall and dig face bunding in place.

  • 25. High wall cracking or water issues evident.

  • 26. Was bunding removed from active dig area during shift?

  • If yes, was authorization sought from area Supervisor prior to removal and was bunding replaced?

  • 27. Night shift lighting is adequate

  • 28. Lighting plants have the appropriate bunding in place.

  • 29. Designated light vehicle park up area has been established and maintained.

Dump Area

  • 30. Area dump heights no more than 20 meters?

  • Is a JSA in place?

  • 31. Dump area is free of cracks and drainage controls in place?

  • 32. Access to the toe of all dumps are bunded off to all traffic.

  • 33. Is water present at the toe of the dump and if so, is dumping short and dozing occurring under a JSA?

  • 34. Compliant to dump plan designs.

Completion

  • General Notes/Comments

  • Supervisor

  • Crew

  • Superintendent

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.