Information
Details of repair
-
Property address
-
Bertram reference
-
Client Reference
-
Client
-
Completed by
-
Conducted on
-
Your location can be autofilled here (for speed, good signal required) this will not be as accurate as manually completing the address
Trades
Trades required
-
Please select trades required
-
Underpinning
-
Shire pile
-
External decorating
-
Bricklaying
-
Pebble dashing
-
Patio laying/paving
-
Landscaping
-
Concreting
-
Internal decorating
-
Wallpapering
-
Replacement ceiling
-
Plastering
-
Helical bars
-
Rendering
-
Grout injection
-
Tiling
-
Drainage specialist
-
Electrical works requiring specialist
-
Gas works
-
Plumbing
-
Roof specialist
-
Carpenter
-
Floor laying
-
- laminate
- wood
- other
-
Carpeting
-
Other
-
Specify other trades required
Site requirements
Checklist and general information
-
Anticipated start date
-
Add details if under Notifiable CDM and requires a coordinator and F10
-
Is policyholder moving into alternative accommodation
-
Add details
-
Is there a party wall issue?
- Yes
- No
-
Enter details
-
Does the council need to be contacted?
- Yes
- No
-
Enter details
-
Is parking permit required?
- Yes
- No
-
Enter details
-
Is congestion charge applicable?
- Yes
- No
-
Enter details
-
Is there an access issue?
- Yes
- No
-
Enter details
-
Is a damp report required?
- Yes
- No
-
Enter details
-
Please add photo(s) showing access issue
-
Is drying and certificate required?
- Yes
- No
-
Enter details
-
Is building notice applicable?
- Yes
- No
-
Enter details
-
Is herras/security fencing required?
- Yes
- No
-
Enter details
-
Is asbestos an issue? (detail in risk assessment)
- Yes
- No
-
Enter details
-
Is a skip licence required?
- Yes
- No
-
Enter details (including location, duration, and if required on day 1)
-
Is scaffold required?
- Yes
- No
-
Location
-
Is tower required?
- Yes
- No
-
Location
-
Is the hire of a port-a-loo required?
- Yes
- No
-
Is the hire of a storage pod required?
- Yes
- No
-
Does the work involve demolition?
- Yes
- No
-
Enter details
-
Standard of finish required
- High specification
- Normal standard
Supporting documentation & materials
Supporting Documentation (photos/scanned docs/drawings)
-
Would you like to add a drawing?
- Yes
- No
-
Please add drawing here
-
Would you like to add a photo or scanned document picture?
- Yes
- No
-
Many photos can be added here from the camera or the library. Just keep selecting the + sign to add another photo.
-
General site notes
Materials & operative team
-
Are there any materials that need to be put on order?
- Yes
- No
-
Enter details
-
Has material choice been discussed or been chosen?
- yes
- no
- NA
-
Enter details
-
Has a material choice sheet been left for the policy holder?
-
Please detail the material required and approximate amounts
-
Helibars
-
Resin
-
Grout
-
Carpet protector
-
Megafilm
-
Do you have an operative team in mind?
-
Details of preferred operatives
Reminder and sign off
Reminders
-
Has the H&S Risk Assessment been completed?
-
If you have difficulties in answering aspects of the Risk Assessment: Please refer to the H&S manual or contact Capita Symonds. 020 8761 7830 07785 454783 richard.leppard@capita.co.uk
-
Has a 360 Site View video been done?
-
Has the Policy holder mandate been completed? (electronic template available)
-
Has the XS been collected during the visit?
-
Ensure that the Excess Payment form has been completed and return cheque to Bertram finance.
-
Has the PH been left a PH leaflet?
-
Has the PH/occupant shared welfare certificate been completed?
Sign-off
-
Name & Signature
-
Please email this form to your coordinator and cc allocation manager