Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Pre-start Site Assessment
-
1.1 Has the operator completed a site assessment before commencing work?
-
1.2 Does the operator have all the necessary information for the job required, such as B4 U Dig Plans and used this information to locate service start points eg water toby?
-
1.3 Photos of the site
2. Cable Locator Operation
-
2. 1 What method of Cable Location is the operator using to locate the service?
-
2.2 Is the operator able to explain what the differences are between the two location methods?
-
2.3 Has the operator set up the Cable Locator correctly for the service he/she is trying to locate?
-
2.4 Has the operator marked out the services found correctly, with the right service colours etc?
-
2.5 Photo of marked services that have been found.
-
2.6 Can the operator describe what to do if they are unable to get a depth reading?
3.0 Recording
-
3.1 Can the operator describe what form is used for recording the services?
-
Can the operator describe how to fill out the form correctly?
-
Photo of completed Cable Location Data Form
-
Has the form been sumbitted to the job file and a copy left in the SSSP?