Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1. Pre-start Site Assessment

  • 1.1 Has the operator completed a site assessment before commencing work?

  • 1.2 Does the operator have all the necessary information for the job required, such as B4 U Dig Plans and used this information to locate service start points eg water toby?

  • 1.3 Photos of the site

2. Cable Locator Operation

  • 2. 1 What method of Cable Location is the operator using to locate the service?

  • 2.2 Is the operator able to explain what the differences are between the two location methods?

  • 2.3 Has the operator set up the Cable Locator correctly for the service he/she is trying to locate?

  • 2.4 Has the operator marked out the services found correctly, with the right service colours etc?

  • 2.5 Photo of marked services that have been found.

  • 2.6 Can the operator describe what to do if they are unable to get a depth reading?

3.0 Recording

  • 3.1 Can the operator describe what form is used for recording the services?

  • Can the operator describe how to fill out the form correctly?

  • Photo of completed Cable Location Data Form

  • Has the form been sumbitted to the job file and a copy left in the SSSP?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.