Checking items/检查信息
-
Project<br>项目名称
-
Procedure<br>工序
-
Level 楼层
-
Panel NO. 板块号
-
Date 检查时间
-
Is the installation of rock wool qualified?<br>岩棉安装是否合格
-
QC Inspector 检查人员
Checking list/检查内容
- Panel/板块
-
Panel NO. 板块编号
-
1. Is the backboard installed correctly?<br>固定角码/背板安装正确?
-
2.Inspect the screws of the fixed T-shaped hangers to check for any markings and signs of looseness? (using a torque wrench for random checks).<br>2.检查固定T型挂件螺钉是否有做记号和松动的情况?(随机用扭力扳手检查)
-
3.diagonal dimension<br>对角线尺寸( ±2MM(<3M), ±3MM(≥3M)
-
4. Is the direction of cutting and installation of the rock wool correct?<br>岩棉切割与安装方向是正确?
-
5.Was whole-piece rock wool used for installation?? Avoid joints wherever possible.<br>是否使用了整块岩棉安装? 尽量不要拼接。
-
6. Is the Insulation rock wool installed according to the drawings?<br>保温岩棉是否按照设计图纸安装?
-
7.Has the cavity barrier rockwool installed according to the design drawings?<br>空腔防火隔离带岩棉是否按照设计图纸安装?
-
8.Are the holders for fire-resistant rock wool mechanically secured, and is the spacing accurate and sufficient?<br>防火岩棉的岩棉钩是否为机械固定,间距是否准确?
-
9.Have the types of rock wool been correctly identified? Firestop 100kg/m3 & Insulation 60kg/m3<br>是否正确识别岩棉种类?防火岩棉110kg/m3 & 保温岩棉 60kg/m3
-
10. Is the rockwool properly installed? Is it securely fixed, and is the perimeter tightly packed?<br>岩棉是否安装到位?是否牢固?四周是否塞严实?(需要拍照)
-
11.Label<br>板块标签(需要拍照)