-
Date and Time of Audit
-
Production Day ? Enter the production day this audit is applicable to.
-
Carried Out By:
-
Carried Out By:(if second person involved.
-
Carried Out By:(if third person involved.
Slicer One
Metal Detector Fail Safe Challenge Test
-
Reject Confirmation
Insert test piece into product and pass down line, remove sample before reject mechanism and confirm that line stops. -
Air Pressure
Run metal detector and turn off air isolation valve to confirm line stops. -
Search Head Failure
Turn off metal detector belt and sit metal object (test weight) under head unit. After approx 15 secs the message "self check Magnitude Error" comes up on screen. After about 2 secs this message is replaced with "Balance Fault" which stays on screen until the object is removed and the belt is turned back on. -
Back Up sensor
Run metal detector and cover sensor prior to M/D head for 5 secs to confirm line stops. -
Photo Electric cell pre search head.
Insert test piece into leading edge of product and pass down line to and confirm that the product has been rejected into the reject bin. -
Photo Electric cell pre search head
Insert test piece into trailing edge of product and pass down line to and confirm that the product is rejected into reject bin. -
Metal Detector Verified by
-
Record any actions taken or needed.
Slicer Two
Metal Detector Fail Safe Challenge Test
-
Reject Confirmation
Insert test piece into product and pass down line, remove sample before reject mechanism and confirm that line stops. -
Air Pressure
Run metal detector and turn off air isolation valve to confirm line stops. -
Search Head Failure
Turn off metal detector belt and sit metal object (test weight) under head unit. After approx 15 secs the message "self check Magnitude Error" comes up on screen. After about 2 secs this message is replaced with "Balance Fault" which stays on screen until the object is removed and the belt is turned back on. -
Back Up sensor
Run metal detector and cover sensor prior to M/D head for 5 secs to confirm line stops. -
Photo Electric cell pre search head.
Insert test piece into leading edge of product and pass down line to and confirm that the product has been rejected into the reject bin. -
Photo Electric cell pre search head
Insert test piece into trailing edge of product and pass down line to and confirm that the product is rejected into reject bin. -
Metal Detector Verified by
Slicer Three
Metal Detector Fail Safe Challenge Test
-
Reject Confirmation
Insert test piece into product and pass down line, remove sample before reject mechanism and confirm that line stops. -
Air Pressure
Run metal detector and turn off air isolation valve to confirm line stops. -
Search Head Failure
Turn off metal detector belt and sit metal object (test weight) under head unit. After approx 15 secs the message "self check Magnitude Error" comes up on screen. After about 2 secs this message is replaced with "Balance Fault" which stays on screen until the object is removed and the belt is turned back on. -
Back Up sensor
Run metal detector and cover sensor prior to M/D head for 5 secs to confirm line stops. -
Photo Electric cell pre search head.
Insert test piece into leading edge of product and pass down line to and confirm that the product has been rejected into the reject bin. -
Photo Electric cell pre search head
Insert test piece into trailing edge of product and pass down line to and confirm that the product is rejected into reject bin. -
Metal Detector Verified by
-
Record any actions taken or needed.
-
Supervisor Signoff