Title Page
-
Site conducted
-
Document No
-
Conducted on
-
Prepared by
-
Client / Site
-
Project Number
-
Site Manager
-
Week of programme
1.0 SITE SET-UP
-
SITE SET-UP
-
1.1 SITE PRESENTATION
-
1.1 Does the site give a good first impression on approach?
-
1.2 SITE ACCESS.
-
1.2.1 Is site access adequate and clearly visible?
-
1.3 SITE SECURITY.
-
1.3 Is the site secure from unauthorised access both in and out of hours?
-
1.4 SMART START.
-
1.4 Is adequate signage displayed around the site?
-
1.5 HOUSEKEEPING.
-
1.5 Is the site generally tidy?
-
1.6 WELFARE.
-
1.6.1 Is welfare provided and compliant with CDM Regulations?
-
GUIDANCE
-
Toilets; large wash basins; running hot (warm) and cold washing water; washing consumables; a clean rest room with lights, heating and seating; drinking water, means to heat water/food; and an area for storing and drying work clothes.
-
1.6.2 Is welfare clean and tidy?
-
Please state why this section is not being checked on this occasion
2.0 HEALTH AND SAFETY
-
HEALTH AND SAFETY
-
2.1 Works
-
2.1.1. Are RAMS available, submitted and reviewed for all planned work coming up?
-
2.1.2 Are any RAMS inadequate for forthcoming works?
-
2.1.3 Are there any high risk activities planned for the next 7 days?
-
Please detail further, including control measures:
-
2.2 DAILY CHECKS.
-
2.2 Is there evidence of daily plant checks being completed?
-
Guidance
-
I.e. Attach a photo of plant daily checks (i.e. HS170 'MEWP daily checks')
-
2.3. PERMIT TO WORK.
-
2.3.1 Are permits to work being issued where required?
-
GUIDANCE
-
Hot works, roof works, confined space, permit to break ground, electrical works etc.
-
2.3.2 Are permits completed and closed down correctly?
-
2.4 TEMPORARY WORKS
-
2.4.1 Is TW Register up to date, correctly completed and available on Link?
-
2.4.2 Are TW designs (including calculations) available where applicable?
-
2.4.3 Has there been any changes to the TW that may effect the Permanent Works?
-
2.4.4 Is the TW Appointment Letter available on site?
-
2.4.5 Are permits completed, issued and closed down correctly?
-
2.5 RISK REGISTER
-
2.5.1 Is the project Risk Register available on Link and the latest revision?
-
2.5.2 Are any planned works/events likely to affect the project Risk Register?
-
If so, what are these works/events?
-
2.6 INSPECTIONS
-
2.6.1 Have all actions been closed out from previous inspections?
-
2.6.2 Are any planned client inspections due in the next 7 days?
-
2.7 INCIDENTS
-
2.7.1 Have any accidents, incidents or near misses occurred since previous inspection?
-
Please add further detail on type of accident/incident or near misses
-
Please state why this section is not being checked on this occasion
3.0 QUALITY
-
QUALITY
-
3.1 QUALITY CONTROL
-
3.1.1 Have necessary works nearing completion/completed been checked by the Site Manager?
- Yes
- No
- N/A
-
Which contractors works have been signed off?
-
3.1.2 Which contractors works are to due to be signed off in the next 14 days?
-
3.2 COMPLETED WORKS.
-
3.2 Are they any concerns over quality?
-
3.2.1 Is there evidence of quality issues?
-
3.3 QUALITY CONTROL
-
3.3.1 Is there evidence of HBP quality control procedure in place? (Site Audit Pro)
-
Is this stored in LINK?
-
Please state why this section is not being checked on this occasion
4.0 PROCUREMENT
-
PROCUREMENT
-
4.1 PROCUREMENT SCHEDULE (CON137)
-
4.1 Any procurement issues raised in the previous Weekly Site Meeting?
-
Have these been resolved?
-
Please detail further:
-
4.2 LABOUR FORECAST (CON058).
-
4.2.1 Has the weekly labour forecast been issued to Operational Support?
-
4.2.2 Are there weekly (fortnightly) projections forecasts available for the job and are they communicated to site?
-
4.3 REQUISITIONS (CP031)
-
4.3 Are requisitions sufficiently detailed and issued on a timely basis?
-
4.4 GOODS RECEIVED + PLANT SKIP (CON041).
-
4.4.1 Are Goods Received & Plant Returns being completed on Evision?
- Yes
- No
- N/A
-
4.4.2 Have any loss/damages been reported since previous inspection?
-
Specify loss/damages
-
GUIDANCE
-
Any loss or damages should be reported to the Buying Department along with suitable evidence.
-
4.4.3 Have photographs of any items being off hired/ returned been sent to buying?
-
Please state why this section is not being checked on this occasion
5.0 OPERATIONAL
-
OPERATIONAL
-
5.1 PROGRAMME (CON136)
-
5.1 Is the contract programme up to date and being tracked weekly?
-
5.2 DRAWING REGISTER
-
5.2.1 Is the latest revision of drawing register available on site?
-
5.2.2 Are the latest drawings revisions available on site?
-
5.2.3 Are all drawings clearly defined as being issued 'for construction'?
-
5.4 SITE DIARIES (CON044)
-
5.4.1 Are site diaries completed daily and available on LINK?
-
5.4.2 Is there sufficient information provided?
-
5.4.3 Is there any outstanding actions required?
-
5.5 PROGRESS PHOTOS
-
5.5.1 Are progress photos uploaded on LINK regularly?
-
5.5.2 Are progress photos titled and re-sized correctly? (site / date / area)
-
5.6 RFI (CON090)
-
5.6.1 Is there an RFI Register?
-
5.6.2 Are there any overdue actions on the RFI Register?
-
Please detail:
-
5.7 PROJECT DETAIL (LINK)
-
5.7.1 Are the project details on LINK correct? (i.e. Project status, PC date, project duration, project directory etc.)
-
5.8 MEETING MINUTES (CON145)
-
5.8.1 Are regular meetings taking place?
-
5.8.2 Are previous meeting minutes documented and on Link?
-
5.8.3 Have the minutes been issued to the relevant parties?
-
5.9 CLIENT FEEDBACK
-
5.9.1 Has the client provided any feedback?
-
5.9.1.1 What feedback has been provided?
-
5.9.1.1 What feedback has been provided?
-
5.9.1.1 What feedback has been provided?
-
Please state why this section is not being checked on this occasion
-
Is this inspection complete?
Completion
-
Any further comments / recommendations arising from this inspection?
-
Date of next meeting
-
Contracts Manager
-