Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Existing site
-
Pictures of exterior paving been taken?
-
Engineering survey completed?<br>
-
Above ceiling inspection?
-
Furniture need to be relocated?<br>
-
Who is responsible for moving furniture?
-
Inspection of existing roof drains and scuppers,are they clean?
-
Existing roof leaks present?
-
Shut off valves for existing systems been located and identified?
-
Floor protection? Who has? What type of product?
-
Protection of door frames?
-
Protecting existing walls ?
-
Gas line inspection by district?
Project site
-
Existing utilities been identified, located, potholed.
-
How are we accessing roof?
-
Fencing required around site ? Has it been ordered?
-
Material storage?
-
Dumpsters for project
-
John spencer to set up Jobsite,is it required? <br>John spencer(866-800-1614)
Required Project Postings
-
Project sign required? And ordered?
-
TCEQ/NOI notice (SWPPP postings) posted in public view
-
SWPPP plan posted in job trailer
-
Construction permit posted
-
OSHA 300 log posted
-
Northstar Signage package posted
-
Emergency phone numbers posted
-
Emergency action plan created and posted
-
Project site specific management plan
-
Dept. of labor signage( 5 in 1 poster) English and Spanish posted ( federal and state )
Project documentation
-
Project schedule?
-
Earthwork fill log created
-
Pier log created
-
Daily reports on ownerinstie,with man power and man hours documented
-
Site logistics plan created and posted?
-
Submittals log created
-
RFI log created
-
Delivery log created
-
Drawings posted with all addenda
-
Weekly owners meeting set up
-
Weekly subcontractor meeting set up
-
Northstar safety program book on site
-
Northstar HAZCOM book on site
-
major subcontractors registered with the city ?
-
Osha 29 CFR.1926. Book