Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Documentation & Site Files

  • Construction Phase H&S plan developed & being maintained. Inductions carried out & up to date. Site sign in/out sheets accurate. Site inspection records completed & up to date. Permits to work issued & correctly closed out

  • Score<br>

Method Statement & Risk Assessment

  • Method Statements & Risk Assessments site specific, relevant to current works, signed & dated by workforce, operatives inducted in RAMS and familiar with content. RAMS reviewed. Young persons risk assessment.

  • Score

Sub-contractors

  • Sub-contractors appointed have site specific RAMS in place, site induction completed, appropriate supervision, correct plant/equipment. Working safely in compliance with RAMS

  • Score

Training & Competence

  • Current & valid training records for site personnel in site files (SMSTS/ SSSTS/ CSCS/ CPCS/ ECS, Asbestos Awareness, PASMA, IPAF etc.)

  • Score

Welfare Arrangements

  • Welfare arrangements satisfactory. Suitable numbers chairs/tables. Drinking water on site. Means of preparing & heating food/drinks. Suitable number of toilets & hand washing facilities. Warm water for hand washing. Provision & stock of replacement consumables (toilet roll, hand towels, soaps etc.). Facilities clean & tidy. Rubbish bins. Smoking area

  • Score

Site security, signage & traffic management

  • Is site secure. Hoarding/ fences/ barriers in place, secure & in good order. Construction H&S signage posted at site compound and in work area. Informational signage in office & welfare area. Fire signage posted. Traffic management plan developed & up to date, travel routes clearly marked & segregation of pedestrians from vehicles

  • Score

Access/Egress & Housekeeping

  • Acess/egress routes clearly identified, free from obstruction, suitably lit, and in good condition. Housekeeping, cable management & material storage in good order to prevent slip/trip/strike hazards. Waste materials kept in good order & being regularly removed to skip. Control of dust.

  • Score

PPE & RPE

  • Suitable PPE identified in RAMS. Mandatory PPE being worn. Task specific PPE being worn where required. PPE/RPE suitable for task & in good condition. Face fit testing carried out for RPE

  • Score

Asbestos

  • Current asbestos survey report available & copy in site file. Asbestos warning notices posted for managed ACM's in work area (if relevant). Asbestos awareness training records in site file. Asbestos works carried out by authorised contractor - isolation of work areas, plan of work (incl. RAMS, training records, control measures, waste controls etc.) in place.

  • Score

Occupational health

  • Suitable controls in place for occupational health hazards, noise, vibration, dermatitis, respiratory, asbestos, lead, COSHH, leptospirosis, sharps/needles etc.

  • Score

COSHH

  • Have hazardous materials/substances on site been identified, COSHH assessments in place & operatives inducted in assessments. Are materials/substances being used & stored in compliance with assessment. Is correct PPE/RPE being used

  • Score

Manual Handling

  • Have manual handling activities been identified and are manual handling task risk assessments in place. Is there manual handling aids/equipment available (forklift, pallet lifter, trolley etc.). Do the operatives have suitable training/guidance/information to carry out manual handling task.

  • Score

First Aid & Accident Reporting

  • Is there suitable numbers of first aid trained persons on site. Is the first aid box accessible, and adequately stocked. Is the nearest emergency medical facility clearly identified. Have any accidents/incidents/near misses been reported. Are all incidents suitably investigated and learning outcomes communicated

  • Score

Fire Safety

  • Is there a site fire plan and is it suitable for current site environment. Are emergency routes clearly marked & free from obstruction. Is there a suitable means of raising a fire alarm. Are suitable numbers of fire fighting equipment on site, serviced and in good condition. Is suitable fire signage posted. Are all hot works being controlled by permit conditions. Are there any combustible materials/substances in the workplace. Have sources of ignition been identified. Have smoking risks been controlled. Is housekeeping in good order and risk controlled by preventing unnecessary build up of combustible materials (wood, dusts, cardboard, packaging etc.)

  • Score

Plant & Equipment

  • Is the correct plant/equipment being used for the task. Is there a risk assessment for use of the equipment. Is the plant/equipment in good order, no visible defects, have current test/inspection certification. Have the manufacturers recommended safety checks been carried out and recorded. Does the operator have the relevant training qualifications for using the plant/equipment

  • Score

Electrical Safety

  • Are safe lock off & isolation procedures in place. Have live circuits been identified and warning notices posted. Is all portable electrical equipment on site 110 volt. Has portable electrical equipment been PAT tested

  • Score

LOLER & Lifting

  • Is there a site specific lifting plan in place. Do all personnel involved in the lift have the relevant training & are copies of training records in the lifting plan. Does the plan consider site conditions/hazards and environmental hazards (I.e. Weather conditions etc.). Does all plant & lifting equipment (chains, slings, shackles etc) being used have a currently valid test certificate. Is the lifting zone secure from unauthorised entry (barriers, signage etc.). Is suitable monitoring & supervision arrangements in place. Has the load been clearly established and been cross checked with the safe lifting capacity of the lifting plant/equipment. Has a lifting briefing been held before commencement of operations and is a copy of the briefing record in the site file.

  • Score

Work at Height - Scaffolds & Mobile Towers

  • Has the scaffold/tower been designed & erected by a suitably competent & trained contractor (CISRS, PASMA) Is the scaffold being inspected at the relevant intervals and are records of inspections kept. Is the scaffold only being altered or amended by authorised & competent contractors. Is a scaf tag fitted & tag details up to date. Are there any visible defects on the scaffold. Are mobile tower scaffold being used with brakes locked, and outriggers fitted as per manufacturers recommendations. Is an emergency rescue plan in place.

  • Score

Work at Height - MEWP

  • Is the correct MEWP being used for the task. Is there a risk assessment for use of the MEWP. Is the MEWP in good order, no visible defects, have current test/inspection certification. Have the manufacturers recommended safety checks been carried out and recorded. Does the operator have the relevant training qualifications for using the category of MEWP being used. Is there an emergency rescue plan in place. Are safety harnesses fitted with fall restraint lanyards, in good order and being worn correctly. Have harness inspections been carried out and records kept of inspections.

  • Score

Work at Height - Ladders & Podiums

  • Are ladders the most suitable equipment for the task. Has a ladder permit been issued. Are ladders in good condition and free from defects. Are ladders being used correctly ( tied/footed, on a flat level surface, facing the work area, devices for preventing spread locked, top 3 rungs not used as work platform, no over stretching etc.)

  • Score

Work at Height - Fall Protection

  • Are edge protection handrails & toe boards in place, secure and in good order. Has safety netting been installed by FASET trained persons, and copies of current netting inspection records for all nets been provided. Is there an emergency rescue plan in place. Are secondary strike hazards present underneath safety nets ( scaffold standards, uprights etc.)

  • Score

Excavations

  • Is permit to dig in place. Have current services drawings been consulted and ground surveyed using CAT/Genny. Is CAT/Genny calibrated & is operator trained in use. Is excavation suitably battered/benched or shored, and in good condition. Are trench boxes required/in place. Is spoil located at a safe distance. Is there suitable means of access/egress. Is suitable edge protection in place. Is gas monitoring required. Are vehicles stop blocks required. Is there an inspection regime by a competent person and are inspections recorded. Is there a rescue procedure in place.

  • Score

General Comments

  • Audit Rating

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.