WHEN: When demolition is Demolition is complete. This inspection must be completed within 48 hours of the demolition being completed.
-
PHOTOS: All Photos should be taken with a Timestamp Camera, and must include the Date, Time, Address of Property, and Lat & Long. Once all photos are taken, the inspector must download the photos to one PDF, and while on site, must email the file to 166_NCORR_OP@timberlinecg.com, and upload to the TCG Field App under "Applicant Info". Before leaving the site, inspectors must call Kiara Castro to get approval to leave.
-
ITEMS NEEDED FOR INSPECTION: Copy of the site plan used for permitting & camera.
Questions
-
Is the site ready for the Manufactured Home delivery?
-
Has dirt pad been built as shown on site plan? 📸
-
"Has the placement of the home been flagged with white flags per approved proposed
-
Site plan in permit package? 📸📸"
-
Does the proposed placement of the home meet municipality required setbacks?📸📸
-
Has septic/drain field location been marked with a green flag? 📸
-
Has well/water meter location been marked with a blue flag 📸
-
Has septic tie-in been stubbed up and flagged with a green flag? 📸
-
Has water connection been stubbed up and flagged with a blue flag? 📸
-
Does the pad slope 1/2 per ft, out 10' from the proposed edge of MH? 📸
-
Are there any damages to culvert, driveway, concrete pads? 📸
-
Are there any obstructions for MH delivery—fences, sidewalks, trees, powerlines? 📸
-
Does the subcontractors need to revisit the site to correct issues?