Title Page

  • Conducted on

  • Job Number

  • Prepared by

  • VIN

Process Control Inspection

  • Model Number

  • All componetnts present and correctly positioned around JIG 123

  • All componetnts present and correctly positioned around JIG 456

  • All dimensions critical checked in accordance with drawings

  • All welds visually inspected

  • All weld spatter/sharp adequately cleaned/buffed

  • All removable side/end panels test fitted

  • All required galv relief holes drilled

  • Any Steel markings grinded off and wiped down with thinners

  • All ancillary fixing holes present to avoid need for drilling after galv and exposing raw steel (lights, junction boxes etc.)

Final Inspection

Certificate of conformity

  • Date of Cert

  • Signed

  • Photo vin

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.