Title Page
Quality Control Checklist
-
Job Name:
-
Location:
-
Date
-
Type of Inspection:
-
Quality Control Representative:
QC Checklist
QC Checklist
-
Has equipment and materials been installed in a neat and workmanlike manner?
-
Is area to be inspected cleared and free from clutter/debris?
-
Has equipment been cleaned, vacuumed and wiped down?
-
Are all electrical subcontractors complete with work in the requested area to be inspected?
-
Do all employees on site have their Apprentice/Journeyman cards readily available and on their person?
-
Are accurate up-to-date drawings readily available?
-
Are the appropriate wiring methods used for the environment they are installed in?
-
Are materials used Approved and Listed for their intended purpose and environment they will be installed in?
-
Are materials damaged or broken?
-
Is there adequate working clearances, dedicated spaces, or headroom around equipment?
-
Is there adequate illumination provided in the working space?
-
Is there adequate entrance and egress from working space in area containing large equipment?
-
Are all doors/covers closed and dead fronts installed properly with factory screws?
-
Are all identifying equipment labels permanently fastened to equipment to withstand their environment?
-
Are current Arc Flash Stickers present indicating appropriate hazard?
-
Are accurate, printed panel schedules installed?
-
Has equipment controller enclosures been verified to make sure they are rated for the available SCCR value at equipment?
-
Is everything securely mounted and have adequate ventilation space when applicable?
-
Are all unused openings in equipment and boxes closed up properly?
-
Have all conductors been properly labeled?
-
Have all conductors been verified to be away from all sharp edges or bolts/screws?
-
Are all interior barriers in equipment installed properly?
-
Have all conductors been terminated or crimped properly with an approved crimper as per there approved listing and documented in a torque ledger?
-
Have all breakers requiring 3rd party testing been tested, passed and sticker certifications in place?
-
Have all breakers been set to latest coordination study?
-
Have insulation values been checked where conductors from different systems share common enclosures?
-
Have panelboards been checked for the proper overcurrent protection?
-
Have the grounding electrode conductor/conductors and bonding jumper been properly sized?
-
Are cables and conduits adequately supported from their box terminations?
-
Is their proper spacing from cables to edges of framing from screws?
-
Are all EMT connectors, couplings, and lock rings tightened?
-
Are vertical and horizontal run raceways and cables supported at the appropriate intervals?
-
Are bushings or grommets installed on the ends of low voltage conduit stubs?
-
Is all equipment, devices, and boxes grounded properly?
-
Are the correct size plaster rings installed to match the depth of the wall finish?
-
Are all junction or device boxes accessible?
-
Are all floor and wall penetrations properly sealed to match the assembly rating they feed through?
-
Has conductor fill in raceways and boxes been checked?
-
Is proper working clearance provided to all junction boxes above ceiling?
-
Is all unused low voltage cable and devices removed from the ceiling or permanently identified for future use?
-
Is ALL low voltage cable and devices properly supported above ceiling?
-
Have all temp power cords been removed from above ceiling before requested above ceiling inspection?
-
Are all trimmed out devices in wall labeled appropriately?
-
Are all devices straight and securely mounted flush against finish surfaces?
-
Has GFCI protection on branch circuits and devices been installed where required?
-
Have all circuits been energized and receptacles plug tested before requested Final Inspection?
-
Have all Emergency systems (lights, exit signs, etc.) been functionally tested to verify they meet standby power requirements?
-
Are all installed equipment and devices functional?