Title Page
-
Document No.007
-
Audit Title Larch Cladding
-
Wates /Kidwells Estate
-
Conducted on
-
Prepared by: Stanislav Stoyanov
-
Location: Block D
Pre works inspection
-
Has the area been signed off by previous traders, ready for Jessella to commence works?
-
Is the area clean and tidy and free from hazards?
Quality Control Checklist
-
Are the counter battens set to line and level and as per drawing?
-
Comments
-
Are the batten fixings set correctly and to specification?
-
Comments
-
Are the boards and fixings set to line and level?
-
Comments
-
Is the insect /ventilation mesh installed neatly and level?
-
Comments
-
Are the boards overlapping between the two layers of build up?
Quality Control Checklist
-
Comments
-
Are the larch boards trimmed neatly around boiler flues, air vents and RWPS?
-
Comments
-
Are all larch boards chamfered at the bottom edges?
-
Comments
-
Are all larch reveals / jambs and heads in line?
-
Comments
-
Are there any areas that could not be completed and will require return visit to complete?
-
Comments
-
Has the area of work been left clean and tidy?
Area offered for initial inspection
-
Signed for Jessella
-
Signed for Wates
Corrective Actions From Initial Inspection
-
Comments