Foundation
-
N/A
-
Dimensions are per specifications
-
Foundation is at the correct elevation
-
Concrete is free from structural cracks
-
30/60/90 Break tests have been documented and pass
-
Broom finish is consistent throughout
-
Concrete color is consistent throughout
-
Verify version of prints
Structure
-
N/A
-
Walls are plumb
-
Walls are level
-
Ceilings are level
-
Framing is per code
-
Joists are properly supported
-
Verify version of prints
Electrical
-
N/A
-
Outlets are properly spaced
-
Outlets are at the proper height
-
Bathroom outlets on GFCI
-
Kitchen outlets on GFCI
-
No more than 1 motor on a circuit
-
Outlets are proper amperage
-
Switches are proper amperage
-
System is properly grounded
-
Panel labeled
-
Verify version of prints
Plumbing
-
N/A
-
Proper pipe sizing for pressurized lines
-
Proper drain sizing
-
Drains are at the proper pitch
-
Check valve installed at the proper locations
-
Pressure test passed
-
Pressure tank sized correctly
-
Fixtures are free from scuffs and defects
-
Verify version of prints