Title Page
-
Site conducted:
-
Client:
-
Manager/Supervisor:
-
Operative:
-
Work Area:
-
Start Date:
-
Finish Date:
-
Drawing number & Revision Used:
-
Have all fixings been checked and are the right fixings in accordance with design and manufacture guidance?
-
Is SFS installed to the correct gridlines/datums?
-
Are the correct studs being used?(size/gauge)
-
Are studs fixed to the correct cross centre and plumb?
-
Are studs fixed to base and head track on both sides?
-
Are jambs the correct types with correct fixings and plumb?
-
Are the jambs, cills and lintels as per standard details?
-
Is the deflection head correctly installed?
-
Are deflection head screws central in the slot?
-
Is the head track fixed to sub-structure as per details?
-
Is the base track fixed to sub-structure as per details and DPC if required?
-
Are the Structural Openings as per dimensions?
-
Are the duct penetrations in the correct locations?
-
Are the Movement Joint in the correct location?
-
Are the Party Wall studs installed to the correct location?
-
Has work area left clean and tidy?