Title Page

  • Site conducted:

  • Client:

  • Manager/Supervisor:

  • Operative:

  • Work Area:

  • Start Date:

  • Finish Date:

  • Are the screws at correct centre and depth?

  • Are the correct screws being used?

  • Is the board deflection head correctly installed?

  • Is the board cut for duct penetration in the correct location?

  • Is the Windliner tape installed at all board joints?

  • Are the boards inspected for damages and repaired if any?

  • Is the mastic installed to all board to concrete abutments?

  • Has work area left clean and tidy?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.