Title Page
-
Site conducted:
-
Client:
-
Manager/Supervisor:
-
Operative:
-
Work Area:
-
Start Date:
-
Finish Date:
-
Are the screws at correct centre and depth?
-
Are the correct screws being used?
-
Is the board deflection head correctly installed?
-
Is the board cut for duct penetration in the correct location?
-
Is the Windliner tape installed at all board joints?
-
Are the boards inspected for damages and repaired if any?
-
Is the mastic installed to all board to concrete abutments?
-
Has work area left clean and tidy?