Information

  • Document No.

  • Project No.

  • Project Name

  • Client

  • Conducted on

  • Prepared by

  • Location

Background

  • This audit ensures the successful operation of the Hazrem IMS (Integrated Management System) to comply with statutory and regulatory requirements in accordance with:

    🔶 AS/NZS 4801

Project Audit Details

  • Audit Term

  • Project term to date

  • Audit Participants

  • Hazrem Site Supervisor

  • Additional participant name/s

Activities Audited

HAZARDS

  • Have hazards been identified and risks assessed?

  • Are controls measures for high risk activities documented in Safe Work Method Statements (SWMS)?

  • Are SWMS current and site specific?

INCIDENTS

  • Have there been any incidents on site?

  • Have Incident Register Reports been completed?

  • Is the Worksafe injury management and return-to-work program displayed?

DOCUMENTATION

  • Is the following project information in site folders current?

  • Project details and site address

  • Description of works

  • Organization details

  • Supervisor details

  • Are the following registers up to date

  • Training & Competency

  • Site Equipment Register Log

  • Site Log Book - Repirators

  • Hazardous Substance/Dangerous Goods

  • Toolbox Meeting Register Reports

  • Have all employees and subcontractors been inducted into SWMS?

  • Is the Hazrem IMS management system available on site?

Workplace Inspection

ACCESS & EGRESS

  • Are asbestos work zones defined (signage, asbestos tape)?

  • Are prohibited areas barricaded (bollards and tape)?

DUST/AIR QUALITY

  • Is dust suppressed / watered down?

  • Are stockpiles protected from wind?

  • Is all plant & equipment maintained to minimize emissions?

ELECTRICAL

  • Are portable generators in use?

  • Are portable generators fitted with RCD's?

FIRST AID, EMERGENCY & INJURY

  • Are first aid kits provided?

  • Are first aid kits refreshed?

  • Is a First Aid Officer available?

  • Are evacuation procedures in place?

  • Are the emergency contacts displayed?

  • Are fire extinguishers and equipment available?

HAZARDOUS SUBSTANCES & DANGEROUS GOODS

  • Are MSDS's available for products on site?

  • Do the SWMS list precautions for use and relevant MSDS availability?

  • Are Acetylene and oxygen cylinders in use?

  • Are cylinders stored correctly?

HEIGHT WORK

  • Is there any working at height required?

  • Is perimeter protection in place?

  • Are handrails in place?

  • Are penetrations covered?

  • Is fall restraint/arrest system in use?

  • Are SWMS being followed?

HOUSEKEEPING

  • Are materials stacked neatly?

  • Is the work area well lit?

  • Are bins available and in use?

  • Is signage in place?

  • Are electrical leads suspended?

  • Are walkways, stairs and work areas clear?

MANUAL HANDLING

  • Are trolleys and aids in use where applicable?

  • Is the SWMS control measures for manual handling being followed?

NOISE

  • Is plant & equipment maintained?

  • Are site hours being observed?

  • Is hearing protection used in accordance with SWMS?

PPE

  • Select compulsory PPE

  • Is PPE being used when required and in accordance with SWMS?

  • Is PPE correctly worn by employees?

PLANT & EQUIPMENT

  • Is the operator ticketed / competency verified?

  • Are the Plant SWMS being followed?

PUBLIC PROTECTION

  • Is the work area secure from the public?

Observations

  • Are there any other observations or comments?

  • Comments

  • Tap to sketch

Sign-off

AUDITOR

  • Auditor signature

SUPERVISOR

  • Supervisor signature

ADDITIONAL PARTICIPANTS

  • Participant 1 signature

  • Participant 2 signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.