Quarterly Site Management Systems Audit
-
Site
-
Conducted on
-
Prepared by
SITE SPECIFIC SAFETY MANAGEMENT PLAN COMPLIANCE
-
Has the SSSMP been reviewed and signed by all required persons?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the Corporate Safety Policy displayed on the site notice board?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are the Site Safety Rules (NCB001) displayed on the site notice board?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are OH&S statistics being recorded correctly on site foreman reviews (REV003)?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Have all subcontractors been provided with a copy of the SSSMP,I&EMP, EMP, TMP and relevant forms at the time of subcontract award?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are all workers on site wearing the required Personal Protective Equipment (PPE)?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are Safety Notices/Bulletins being displayed on the Site Notice Board?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are Site Safety Walks (NCB010) are being completed at least once per week?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is site signage installed and adequate?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are project personnel contact numbers displayed on the site notice board?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are site working hours displayed on the site notice board?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Have all electrical tools and equipment, incl SC's, been tagged by a qualified electrician with a register maintained?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
RISK MANAGEMENT
-
Has the Project Risk Assessment (NCB028) been completed with controls implemented?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Has the Daily Risk Assessment/Sign On Register been completed noting all hazardous tasks and controls?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are all persons accessing the site signing onto the Daily Prestart Form prior to commencing work?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are new drawings being reviewed, using ADM001, to assess any new hazards/risks?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are any new hazards, and associated controls, being added to the Project Risk Assessment (NCB028) in accordance with ADM001 procedure?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the Monthly Project Risk Assessment Review (NCB028) being completed?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are control measures being implemented effectively?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are updated Project Risk Assessments being provided to Subcontractors for their information?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
HAZARDOUS MATERIALS MANAGEMENT
-
Does the MSDS register contain all hazardous materials that have been brought onto site?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are hazardous materials being stored correctly and in accordance with their MSDS?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are any safety requirements that particular materials require available on site?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are all workers on site using products in accordance with the requirements of the MSDS?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Has a risk assessment (NCB023) been completed for all dangerous goods and hazardous substances?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
EMERGENCY PREPAREDNESS & FIRE SAFETY
-
Is the emergency evacuation diagram suitable for the stage of the project?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Has the Incident & Emergency Management plan been reviewed and approved by a trained fire warden?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the emergency evacuation diagram displayed on site safety notice board?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the emergency evacuation procedure explained to all persons accessing the site?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are fire extinguishers in their correct locations as noted on the emergency diagram?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are the fire extinguishers charged and within their service date?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are the size, number and type of fire extinguishers suitable?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the emergency evacuation assembly point clearly marked and defined?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are emergency evacuation paths of travel free from obstruction?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Has an emergency evacuation drill been completed in the past 3 months?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Have any issues of non-conformance or system failure from drill been addressed and rectified?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
When is the next drill scheduled to occur? Is it entered into the foreman's calendar
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the emergency warning device (air horn) in good working order?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the air horn in an easily accessible location, ie attached to the site office wall, with signage indicating its purpose?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
FIRST AID AND INJURY MANAGEMENT
-
Is the 1st Aid Officer's training current?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the name of the 1st Aid Officer displayed on the 1st Aid Kit and Site Notice Board?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the 1st Aid Kit the correct size for the number of workers on site?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is there an emergency treatment first aid kit available for use on the work site?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is there signage erected on the site shed indicating the location of the first aid kit?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the 1st Aid Kit fully stocked?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the First Aid Register (NCB015) is being completed and maintained for all minor injuries?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are serious injuries being recorded using the Incident Report & Investigation Form (NCB016)?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are Incident Investigation being completed and closed out by qualified persons?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Were the Project Manager, Safety Manager, Construction Manager and Client Representative notified of incidents at the earliest possible convenience?
-
Person responsible for closing out issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
SUBCONTRACTOR COMMUNICATION AND MANAGEMENT
-
Are Tool Box Talks being held fortnightly by subcontractors with minutes being provided to the FM?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is North holding a Tool Box Talks (NCB012) at a minimum of 1 per month with minutes being recorded and displayed on the site notice board?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are Subcontractor meetings being held at a minimum of monthly with safety issues being discussed?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
As part of the TBT, have Subcontractors been consulted regarding the Consultation Arrangements on site?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Have SWMS's been received by all trades working on site and recorded on SWMS register?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Has the SWMS Checklist (NCB005) been completed for all trades working on site?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are Site Safety Walks, Tool Box Talks, Safety Audits, WorkCover bulletins and Corrective Action Reports being displayed on the site notice board?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are plant risk assessments (NCB202) being completed prior to its use on site?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the site Plant Register (NCB021) being maintained and recording all required information?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are subcontractors completing, and providing copies of, daily plant prestart check sheets?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
QUALITY MANAGEMENT PLAN COMPLIANCE
-
Has a Quality Assurance Plan has been prepared based on the North standard template?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Have trades that are not applicable to the project been removed from the QA Plan?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Have QA Checksheets for trades that are not part of the standard template been produced?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Have QA Checksheets been reviewed 1 week prior to the trade commencing on site?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Have QA Checksheets been completed for all works that have been completed on site?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Inspection and Test Plans produced and implemented where necessary?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
DOCUMENT CONTROL
-
Have Drawing on site been checked against the Drawing Registers in the past fortnight?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Has the Drawing Register been provided to all contractors on site during the subcontractor meeting in the past fortnight?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are RFI responses being distributed to the relevant contractors?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are documents and paperwork being filled correctly on site?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
EMPLOYEE REVIEWS
-
Have Foreman reviews (REV003) been completed fortnightly and reviews held with the construction manager?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Have Project Manager reviews (REV002) been completed fortnightly and reviews held with Projects Director/Senior PM?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Have 5 Discipline Reviews been completed fortnightly with the Project Manager and Foreman?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
SITE MEETINGS
-
Have Site Team Meetings been carried out fortnightly with all site employees in attendance?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Have subcontractor meetings been held at a minimum of monthly with the North agenda template being used?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Have client meetings been held fortnightly with a Project Report being produced monthly?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
RESOURCE MANAGEMENT
-
Do site employees have correct training to complete their roles?
-
Person responsible for closing out of issue
-
Close out of issue to be completed by
-
Are the site temporary amenities and offices adequate for the number of workers on site?
-
Person responsible for closing out of issue
-
Close out of issue to be completed by
-
Is site office equipment, e.g. fax, computer, phone, printer, scanner, adequate and working correctly?
-
Person responsible for closing out of issue
-
Close out of issue to be completed by
-
Are tools and equipment that are being used on site checked for calibration prior to use?
-
Person responsible for closing out of issue
-
Close out of issue to be completed by
ENVIRONMENTAL MANAGEMENT PLAN COMPLIANCE
-
Has the Environmental Management Plan been reviewed and signed by all required persons?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Is the Corporate Environmental Policy displayed on the site notice board?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are fortnightly environmental inspections being completed by the site foreman as part of the HSE inspection (NCB010)?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
EROSION CONTROL
-
Has silt fencing been established, maintained and is deemed effective?
-
Person responsible for closing out of issue
-
Close out of issue to be completed by
-
Is the sediment control dam being flocked and pumped regularly?
-
Person responsible for closing out of issue
-
Close out of issue to be completed by
-
Has an effective and maintained silt fence been erected around the spoil/topsoil stockpiles?
-
Person responsible for closing out of issue
-
Close out of issue to be completed by
-
Have maintained sand bags been installed in existing road kerb and gutters?
-
Person responsible for closing out of issue
-
Close out of issue to be completed by
-
Are vehicles accessing the site ensuring that no site soil is leaving the site with the vehicle?
-
Person responsible for closing out of issue
-
Close out of issue to be completed by
FLORA AND FAUNA PROTECTION
-
Tree protection erected with adequate exclusion zones?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
TRAFFIC MANAGEMENT PLAN COMPLIANCE
-
Has a traffic management plan been produced for the project?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Has the TMP been reviewed and signed by all of the required persons?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are all contractors adhering to the requirements for accessing and exiting the site?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are contractors using the designated parking areas?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are contractors using the designated loading/unloading areas?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are vehicles accessing the site using the designated paths of travel only?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Are traffic control measures being implemented effectivly?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Has the RTA/Council been advised of any temporary road closure requirements?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by
-
Has RTA/Council been advised of any temporary footpath closure?
-
Person responsible for closing out of issue
- Project Manager
- Site Foreman
- Leading Hand
- Subcontractor
- Other
-
Close out of issue to be completed by