Information

  • Job Number

  • Room Reference

  • Customer

  • Built by

  • Tested by

  • Conducted on

Rack Equipment

  • Add Rack Equipment/Hardware from the Top Down

  • Rack Equipment
  • Rack Position (enter U position of bottom of equipment)

  • Hardware

  • Enter U height (if on rear add rear)

  • Vent or Blank

  • Equipment

  • Enter U height (if on rear add rear)

  • Make

  • Model

  • Installed?

  • Serial Number

  • Cage nuts installed ?

  • Reason for not installing (client issued etc.)

  • Rack Chassis Guides Required ?

  • Installed ?

  • Cabling Installed ?

  • Enter reason for not installing cables

  • Power

  • Why is power not required?

  • Labelled as per schematic ?

  • Control (LAN/RS232)

  • Why is Control not installed?

  • Labelled as per schematic ?

  • Video

  • Why is Video not installed ?

  • Labelled as per schematic ?

  • Audio

  • Why is Audio not Installed

  • Labelled as per schematic ?

  • Other

  • Why is Other not installed ?

  • Labelled as per schematic ?

Rack Build

  • Overall rack build

  • PAT Test Pass

  • Power supply input connector as specified

  • Enter Connector

  • Cables loomed correctly

  • Cables Labelled correctly

  • Rack connection Panels/Looms terminated as specified

  • Rack connection panels labelled

  • Equipment labelled as to function

  • Add photo of front

  • Add photo of rear

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.