Information

  • Document No.

  • Audit Title

  • NMI#

  • Conducted on

  • Prepared by

  • Location
  • Photo of site

  • Tech being audited

  • Date and Time

  • Job type

Pre-job assessment

  • Inspect site for hazards

  • Contact customer (if required)

  • Confirm safe access to service point/meter board

  • Perform hazard assessment of meter board

Completion of job

  • Confirm meter serial number matches job sheet/palm pilot

  • Read and record meter reading(s)

  • Ensure site is isolated at main switch

  • Put on low voltage glove(s), outer protective glove(s) & safety glasses

  • Test with volt finger to confirm site is isolated at the meter and main switch

  • Remove fuse cover seal

  • Remove fuse cover

  • Test for voltage across service point

  • Open fuse cartridge and re-insert service fuse

  • Close fuse cartridge and re-insert into service point

  • Replace and re-seal service point cover

Post job and vacate site

  • Tidy area including remove old seals from bottom of meter box

  • Complete "reconnection notice" and give to customer or place in letter box, under front door or in meter box

  • Leave the main switch in off position

  • Vacate site

  • Tech being audited

  • Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.