REHABILITATION AND REVEGETATION INSPECTION CHECKLIST

  • undefined

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Untitled Page

  • Weather conditions

  • Work Location

  • Has a approved Rehabilitation and Revegetation Plan been provided

  • Has the area been re-profiled to a level consistent with the surrounding landscape?

  • Has the revegetated treatment been applied in accordance with the client's seed and fertilizer specifications?

  • Have previously cleared vegetation and habitat features been re-salvaged and utilized along the ROW as habitat?

  • Are there sufficient contours, berms, erosion protection, and sediment controls to reduce erosion and siltation during establishment?

  • Have site rehabilitation and revegetation measures achieved the required performance criteria?

  • Have all sodic, saline, and subsoil materials been covered with topsoil or ameliorated to achieve a chemically stable media suitable for plant growth?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.