REHABILITATION AND REVEGETATION INSPECTION CHECKLIST
-
undefined
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Weather conditions
-
Work Location
-
Has a approved Rehabilitation and Revegetation Plan been provided
-
Has the area been re-profiled to a level consistent with the surrounding landscape?
-
Has the revegetated treatment been applied in accordance with the client's seed and fertilizer specifications?
-
Have previously cleared vegetation and habitat features been re-salvaged and utilized along the ROW as habitat?
-
Are there sufficient contours, berms, erosion protection, and sediment controls to reduce erosion and siltation during establishment?
-
Have site rehabilitation and revegetation measures achieved the required performance criteria?
-
Have all sodic, saline, and subsoil materials been covered with topsoil or ameliorated to achieve a chemically stable media suitable for plant growth?