Title Page
-
Site Address:
-
Project Reference :
-
Date of Inspection:
-
Contract:
-
Inspected by:
-
Team Leader:
-
Street works No:
-
Drivers License No.
-
Driver CPC No.
-
Mate(s):
-
Street works No(s):
-
Mate(s):
-
Street Works No(s):
General Site Audit <br>
-
Brief Description of Work:
TOOLS & EQUIPMENT
-
Are fire extinguishers in a satisfactory<br>condition and deployed/ready for use where<br>required?
-
Available tooling and equipment is calibrated<br>and in good condition and there is evidence that a<br>regular inspection has been undertaken and<br>recorded?
-
Is the vehicle in a satisfactory<br>condition providing secure storage and safe<br>access/egress?
-
Has the daily vehicle check been completed?
-
If the vehicle a HGV, is the O License Sticker placed clearly in the window?
-
Are all wheel markers aligned on HGV?
-
Has the daily trailer check been completed?
AVAILABILITY OF DOCUMENTATION
-
Can the Operatives provide evidence of<br>competency to carry out the work activity?
-
Have risk assessments been undertaken<br>where required? (including any additional site<br>specific hazards)
-
Does the Operative have access to the PPL Portal and recent Engineering & Safety<br>Bulletins?
-
Are up to date H codes available and can the<br>operative demonstrate where to input on the<br>system?
-
Does at least one person hold a NRSWA<br>Card?
-
Does Each Member have a PPL,<br>Cadent/Clancy ID Card?
-
Does all staff hold EUSR Cards
USE OF PPE
-
Is appropriate PPE being used/available for<br>the work activity? Minimum requirements: Safety<br>Helmet, Glasses, High Impact Google, Hi Vis,<br>Overalls, Safety Footwear, Gloves and Hearing<br>Protection.
-
Do both team members have "press to check" dust mask?
-
Are all team members clean shaven excluding grabs?
ON SITE SAFETY
-
Have the Reinstatement or Grab team signed in to the Engineering teams Risk Assessment?
-
Has effective customer liaison taken place?<br>(i.e. emergency safety advice KICK etc.) Have team got customer cards?
-
Is sufficient welfare and first aid equipment<br>available and fit for purpose?
-
Are site vehicles and/or mechanical plant<br>parked/operated and controlled in a safe manner?
-
Are hazardous substances managed and<br>stored correctly and are spill kits and drip trays<br>available where required?
-
Has impact on the environment been<br>considered and have appropriate controls been<br>put in place? (this includes actions taken to protect<br>the customers property)
-
Are No Smoking signs displayed where<br>required?
-
Does the grab team have fluorescent tape on the gantry fall arrest arm?
-
Is the fall arrest bar engaged whilst the hiab crane is being operated?
-
Has the HAV’s exposure been recorded?
SIGNING, LIGHTING & GUARDING
-
Adequacy of advance warning of works and<br>understanding of requirements. [+End sign]?
-
Pedestrians protected from site and able to<br>pass work site safely?
-
Safety zone requirements identified and set up<br>correctly? Including your Vehicle.
-
Road Plate skid resistant, suitable for<br>excavation, correct overlap, secured in place and<br>not presenting a hazard?
BACKFILL & REINSTATEMENT
-
Has all excess water been removed from<br>excavation?
-
Are the surface coarse layers constructed to<br>the required depths?
-
Has correct backfill material been used?
-
Are the backfill/reinstatement material tickets<br>available?
-
Is the bituminous material at the correct<br>temperature?
-
Has an appropriate gas marker tile/tape been<br>used?<br>
-
Are boxes chambers vertical, is lid level with<br>final surface and the chamber clear?
-
Have all excessive saw cuts/edges been<br>sealed correctly?
-
Have specialist surfaces/road markings/street<br>furniture been replaced (anti skid etc)?
-
Has modular work been replaced<br>correctly/pointed and free from damage?
-
Have any fixing points for excavation<br>boards/road plates and barholes been reinstated?
-
Is the final reinstatement free from adjacent<br>cracking and undermining?
Site Inspection Form
- SUMMARY
-
Additional Comments:
-
Corrective Actions:
Sign-off
-
Inspection Completed By:
-
Team Leader Signed: