This inspection report should verify that all roofing materials are installed per plans, specifications and manufacturer's recommendations. If deficiencies are noted in this report, submit photo documentation of corrected deficiency to RWC Office Administrator.
-
Correct size fasteners are being used and are installed at proper frequency.
-
If installing fully adhered roof system, minimum outdoor manufacturer's temperature requirements are being met.
-
Flashing is installed as needed and and are tied into exterior weather resistive barrier properly.
-
Insulation on roof meets plans and specifications. (Minimum required thickness installed at low points on rood IE: roof drains).
-
Vapor barrier is installed at the proper location and is continuous.
-
Insulation meets spec (verify required PSF and minimum R value)
-
Crickets are installed per plans.
-
All penetrations have been installed through the roof prior to roofing being installed.
-
All penetrations have been properly flashed per manufacturer's installation instructions.
-
Roof drains and scuppers are properly sealed and flashed.
-
Scupper rough openings are properly wrapped with weather resistive barrier prior to roofing activities.
-
Manufacturer's Rep has conducted or is scheduled to perform an Inspection of installation.
-
Crew Foreman has changed. If "yes" - stop work and and review information from Pre-Installation Meeting.
-
5 or more photos have been submitted with this report.