This inspection report should verify that all windows and/or patio doors are installed per plans, specifications and manufacturer's recommendations. If deficiencies are noted in this report, submit photo documentation of corrected deficiency to RWC Office Administrator.
-
Correct size fasteners are being used and are installed at proper frequency.
-
Building Wrap, flashing tape, caulking, shims etc. are being installed in proper sequence.
-
Window sill has positive pitch.
-
Back dam is being installed across the bottom of the window and up vertically a minimum of 6".
-
Glass variances are being installed at proper locations (tinting, tempered glass etc).
-
Windows are centered in the rough opening to allow for insulation/caulking etc.
-
Minimum manufacturer head clearance is being maintained to allow for building shrinkage and settlement.
-
Patio door pan flashing is being installed properly.
-
Window frames have been inspected for damage.
-
Manufacturer's Rep has conducted or is scheduled to perform an Inspection of window installation.
-
Crew Foreman has changed. If "yes" - stop work and and review information from Window Pre-Installation Meeting.
-
5 or more photos have been submitted with this report.