Information

  • Document No.

  • Production Tom Price Section 44 Daily Pit Inspections - Mine 2

  • Dumps, stockpiles, batters and other work areas.

  • Tom Price Operations

  • Date and time of inspection

  • Shift

  • Rain event

  • Team

  • Inspection completed by

Inspections: Dumps, stockpiles and batters

  • Active areas: TMB & TMA's

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: Dowd Fingers

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: MME

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: NX11

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: NEBC

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: Prongs

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: SSEV LG2

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: S652

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: SPOD

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: STR3

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: Cent Pit

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: West Pit

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: Batters

  • Inspected batter area:

  • 02 Dust suppression: Is dust suppression adequate?

  • 03 Tip head road conditions: Drainage, washouts, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 13 House keeping: Is the work area housekeeping in order?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

  • Active areas: 71C & 72C

  • 02 Dust Suppression: is dust suppression adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 03 Tip head road conditions: Drainage, wash outs, proper width, pot holes, camber?

  • 04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?

  • 05 Delineation: Delineators on haul roads/across dumps clearly visible and reflectors clean?

  • 06 Intersection design: Are intersections at 90 degrees with good visibility? Truck crossing signs? Is LV line of sight adequate?

  • 07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 09 Tip head condition: No cracking/ slumping/ inclined?

  • 10 Dump emergency access: Is access clear and accessible?

  • 11 Unused dumps: Is access restricted?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 12 Lighting for night-shift: Sufficient lighting in place for night-shift?

  • 26 Open edges: Are there any open edges? Is the barricading in place?

Inspections: Other areas

  • Active area: Lower MOC park up

  • 01 Active working area: Is area being used?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 13 House keeping: Is the work area housekeeping in order?

  • 20 Signage: Clean of any mud? Correctly located? Visible?

  • 21 Fencing and safety signage: Adequate and in good condition? Handrails not broken? Signage legible?

  • 22 Emergency equipment: Emergency Lighting in service (e.g. eyewash stations and emergency exit lighting)? Fire equipment in place and serviceable (e.g. hose reels and fire extinguishers)? Eyewash station Serviceable?

  • 23 Check for build up of grease, oil and mud: Is there any build up on mobile equipment? Is the build up a fire hazard?

  • 24 No-go areas: Cones/Windrows in place?

  • Active area: Pit 1 Park up

  • 01 Active working area: Is area being used?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 13 House keeping: Is the work area housekeeping in order?

  • 20 Signage: Clean of any mud? Correctly located? Visible?

  • 21 Fencing and safety signage: Adequate and in good condition? Handrails not broken? Signage legible?

  • 22 Emergency equipment: Emergency Lighting in service (e.g. eyewash stations and emergency exit lighting)? Fire equipment in place and serviceable (e.g. hose reels and fire extinguishers)? Eyewash station Serviceable?

  • 23 Check for build up of grease, oil and mud: Is there any build up on mobile equipment? Is the build up a fire hazard?

  • 24 No-go areas: Cones/Windrows in place?

  • Active area: S6.5 Park up

  • 01 Active working area: Is area being used?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 13 House keeping: Is the work area housekeeping in order?

  • 20 Signage: Clean of any mud? Correctly located? Visible?

  • 21 Fencing and safety signage: Adequate and in good condition? Handrails not broken? Signage legible?

  • 22 Emergency equipment: Emergency Lighting in service (e.g. eyewash stations and emergency exit lighting)? Fire equipment in place and serviceable (e.g. hose reels and fire extinguishers)? Eyewash station Serviceable?

  • 23 Check for build up of grease, oil and mud: Is there any build up on mobile equipment? Is the build up a fire hazard?

  • 24 No-go areas: Cones/Windrows in place?

  • Active area: Dam Wall Park up

  • 01 Active working area: Is area being used?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 13 House keeping: Is the work area housekeeping in order?

  • 20 Signage: Clean of any mud? Correctly located? Visible?

  • 21 Fencing and safety signage: Adequate and in good condition? Handrails not broken? Signage legible?

  • 22 Emergency equipment: Emergency Lighting in service (e.g. eyewash stations and emergency exit lighting)? Fire equipment in place and serviceable (e.g. hose reels and fire extinguishers)? Eyewash station Serviceable?

  • 23 Check for build up of grease, oil and mud: Is there any build up on mobile equipment? Is the build up a fire hazard?

  • 24 No-go areas: Cones/Windrows in place?

  • Active area: Apache Pass Park up

  • 01 Active working area: Is area being used?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 13 House keeping: Is the work area housekeeping in order?

  • 20 Signage: Clean of any mud? Correctly located? Visible?

  • 21 Fencing and safety signage: Adequate and in good condition? Handrails not broken? Signage legible?

  • 22 Emergency equipment: Emergency Lighting in service (e.g. eyewash stations and emergency exit lighting)? Fire equipment in place and serviceable (e.g. hose reels and fire extinguishers)? Eyewash station Serviceable?

  • 23 Check for build up of grease, oil and mud: Is there any build up on mobile equipment? Is the build up a fire hazard?

  • 24 No-go areas: Cones/Windrows in place?

  • Active area: Laydown Areas

  • 01 Active working area: Is area being used?

  • 08 Dump construction: Dump to design, All ground disturbance approved?

  • 13 House keeping: Is the work area housekeeping in order?

  • 20 Signage: Clean of any mud? Correctly located? Visible?

  • 21 Fencing and safety signage: Adequate and in good condition? Handrails not broken? Signage legible?

  • 22 Emergency equipment: Emergency Lighting in service (e.g. eyewash stations and emergency exit lighting)? Fire equipment in place and serviceable (e.g. hose reels and fire extinguishers)? Eyewash station Serviceable?

  • 23 Check for build up of grease, oil and mud: Is there any build up on mobile equipment? Is the build up a fire hazard?

  • 24 No-go areas: Cones/Windrows in place?

Declaration

  • I have performed a safety inspection of the Tom Price Pit ensuring that the workplaces are safe for persons working there. The pit was found to be:

  • Action taken:

  • I have taken the appropriate actions to ensure that any hazards I identified during my inspection have been rectified and/or have been demarcated in such a way as to not present a hazard to any persons working on the mine site.

  • I am satisfied that the mine is safe for persons to work in.

  • Supervisor inspecting:

  • Step-up Supervisor:

  • Add signature

  • Oncoming Supervisor:

  • Step-up Supervisor:

  • Add signature

  • Quarry Manager or Delegate:

  • Additional comments:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.