Information

  • Audit Title

  • Client / Site

  • Location
  • Prepared by

  • Contact phone number

  • Conducted on

  • Other staff

  • Development Application Number

  • Complying Development Number

  • Construction Certificate Number

Inspection items

  • Appropriate timber has been selected and utilised

  • Notes

  • Timber members are not defective

  • Notes

  • Spans are correct based on timber structural rating and sizes

  • Notes

  • Roof of layout are as per the development consent

  • Notes

  • Timber size is appropriate and grading is appropriate for the construction

  • Notes

  • All roof bracing is adequate and fixed appropriately to the top plates

  • Notes

  • Collar ties are installed and bolted with minimum M10 bolts

  • Notes

  • M16 bolts fixing rafter to ceiling joist for struts greater than 60 degrees

  • Notes

  • 4 nails per end of a multigrip or triple grip

  • Notes

  • 4 nails per end of a multigrip or triple grip and 2 nails of the grip to the top end of the top plate.

  • Notes

  • All timber is appropriately fixed to each other timber member or steel member

  • Notes

  • Under-perlins, struts and blocking have been installed correctly over a hanging beam or on to appropriately constructed studs with top plate

  • Notes

  • Penetrations, cuttings or notches do not exceed engineered timber product specifications or AS 1684 Timber Framing Code

  • Notes

  • All fire resistant material is installed appropriately in fire rated elements

  • Notes

  • Non-combustible materials have been installed as required

  • Notes

  • Unlike metals within the frame are spaced or adequately protected from galvanic corrosion

  • Notes

  • Correct cladding has been installed on the exterior of the structure

  • Notes

  • Hoop iron straps have been installed in single leaf masonry garage and double brick constructed dwellings

  • Notes

  • Truss system installed as per manufacturers specifications

  • Notes

  • Rafters have been adequately fixed to the top plates

  • Notes

  • Flashing is correctly installed

  • Notes

  • Insulation has been installed in accordance with BASIX

  • Notes

  • Development as per the Development Consent

  • Noted unauthorised development

  • Site notes

  • Photograph

Required information

  • Required information to be submitted to Council

Inspection result

  • Result of the inspection

  • Should you have any enquiries regarding this inspection report please contact Auburn City Council on 9735 1222 or via email council@auburn.nsw.gov.au or in person at the customer service centre located at 1Susan Street, Auburn.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.