Roofing QC checklist

  • Have all structural inspection inspections been completed "roof ready"

  • Has precast caulking, and patching been inspected and approved

  • Concrete slab cure inspections been completed

  • Has roofer signed off that sub surfaces are complete and ready to be covered

  • Spec sheet 07-54-19 has been reviewed with foreman

  • Are all roof penetrations cored and installed, all fall protection points are installed, and entry platform posts are installed, in all areas to be covered by roofing

  • Parapet blocking is completed per details

  • All fire and smoke stopping is completed to details

  • All roofing surfaces cleaned and clear of debris

  • Curtain wall parapet framing, sheeting, and MB-1 is complete per details

  • RVR is installed properly with 3" side lap, 6" end lap, and extends up and sealed at precast and other roof penetrations

  • Roof drain body's and overflow drains are installed and sealed correctly (5A607)

  • 2 layered insulation joints are offset at a minimum of 12"

  • Cover board joints are offset at a minimum of 6" to the insulation joints

  • Wall anchors at curb wall are installed, and sealed per (5A649)

  • PVC membrane seams are 100% probed for weld integrity

  • "Finished roofing" signage is posted at finished roof areas

  • Scheduled inspection and review with targets John Erland

  • Membrane boots are installed per details 5/A607

  • Daily photos

Roofing type 1 (fully adhered metal decking)

  • Adhesion test is positive

  • Roof hatch and ladder curbs complete

  • Loose laid insulation is laid and slopes per the plan

  • Cover board, and Rhino bond fasteners are installed, and spaced per manufactures instructions 9/A607

  • PVC-1 membrane properly attached per rhino bond anchoring system, all welded seams overlapped a minimum of 3" if mechanically welded, and 4" if hand welded

  • Flexible foam rod has been installed along precast (1/A649)

  • Membrane to continue up and over parapet (1A649

  • Walkway paths are installed per plan

Roofing type 2(fully adhered to concrete)

  • Adhesion test is positive

  • Vapor retarder, insulation, and ply wood is installed at penthouse curb wall (5/A649)

  • Roof dividers are framed, Sheeted, and installed per plan

  • Roof expansion joint is framed, sheeted per plan (5/A607)

  • Insulation is fully adhered and slopes per plan

  • Cover board is fully adhered to insulation

Roofing type 3 (ballasted metal deck), Roofing type 4 (ballasted concrete deck)

  • Loose laid vapor berries installed per plan

  • Loose laid insulation is laid and slopes per plan

  • Loose laid PVC-2 membrane is installed per plan

  • PVC-2 is mechanically fastened or fully adhered at the perimeter per plan

  • PVC-2 to continue up and over parapet details A608

  • Final review scheduled with target before covering with ballast

  • Protection layer over PVC is installed with 6" overlap, and 12" overlap at penetrations

  • Protection membrane to be ballasted at the end of each day

  • Size 3 aggregate used 12lb/ per sq ft in field, 15lb at the perimeter

  • Roof pavers installed per plan

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.