Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Site Address
-
Site Photograph
-
Select date
-
door type
-
Engineer Comments
-
Door type (physical construction)
-
Engineer Comments
-
is the door opening/closing
-
Engineers comments
-
Method of holding door secure
-
door type(closing mechanism)
-
Engineer Comments
-
Spring tension checked
-
Hinges lubricated
-
Weather strip condition checked
-
Door alignment checked
-
Engineer Comments
-
Break Glass operation
-
Engineers Comments
-
Door opening speed/force correct
-
Engineers comments
-
Door hold open duration
-
Hold open duration (seconds)
-
Door closing speed/force correct
-
Engineers Comments
-
Safety Sensor system checked (where fitted)
-
Engineer Comments
-
Method of egress (PTE/Fob)
-
Engineer Comments
-
sketch if required
-
Client Signature
-
Surveyor Signature