Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
SWMS No ID & description?
-
Does the SWMS have the required general information?
-
Did the Safety representitive involve the entire crew when filling out the SWMS?
-
Did the crew acknowledge that they understand the SWMS job steps, hazards, and mitigation steps prior to signing onto the SWMS?
-
Does the SWMS identify all the required PPE to preform the job?
-
Does the SWMS identify all the jobs steps?
-
Does then SWMS identify all the hazards associated with the job steps?
-
Does the SWMS identify all actions to mitigate each hazard listed?
-
Is the SWMS filled out neatly?
-
Is the SWMS specific to the job being performed?
-
Are all personnel signed on the SWMS that are in the safe work permit?
-
Copy of SWMS
-
Signature of Auditor
-
Signature of Auditee