Overview Job Pictures
-
Executive summary for the safety and risk status of the project.
PPE (Personal Protective Equipment)
-
Hard Hats worn 100% of time, per policy? 1926.100
-
Safety Glasses worn 100% of time, per policy? 1926.102
-
If Prescription glasses are used the user has side shields on them
-
High visible apparel worn when required by project, traffic, or earthwork?
-
Hearing protection as required.
-
Safety appropriate footwear worn as needed? 1926.28(a)
-
Respiratory protective measures in place?
-
Safety Glasses appropriate for environment and conditions (do not fog, overhead work or debris from wind, on nose, not broken)?
-
Face Shields used for appropriate hazards.
-
Goggles used for appropriate hazards.
-
Cut resistant gloves worn for laceration hazards?
-
Leather gloves worn for puncture hazards?
-
Chemical protective gloves used for corrosive chemicals
Awareness
-
Employees are aware of the hazards around them?
-
Employees are not overexerting themselves?
-
Employees know how to protect themselves from workplace hazards?
-
Employees are not working/ passing through areas that they are not supposed to?
-
Employees are not working in a way that is going to put other employees in danger?
Administrative
-
Are labor law postings available and posted in an accessible place? 1903.2(a)(1)
-
Safety Data Sheets on site for every chemical exposure?
-
Do employees know where the site plan & safety data sheets are located and can access them?
-
Has a site safety plan been developed and followed during installation?
-
Daily job hazard analysis sheets are being completed if necessary?
-
Emergency postings visible and employees know where to find them?
-
First aid kit accessible and checked weekly? 1926.50(d)(1-2)
Housekeeping
-
Sanitation good. This includes clean toilet facilities and potable water? 1926.51(a&c)
-
Nails from used lumber removed? 1926.250(b)(8)
-
Aisle way and walking surfaces clear of debris? 1926.250(a)(3)
-
Cords removed from ground and tripping hazards identified?
-
Material neat and orderly stacked. Professional appearance? 1926.250(a)(1)
-
Trash placed in dumpsters?
-
No spills, prevention and containment measures in place?
-
Break areas are sufficient and hygienic?<br>
-
Materials secured against high winds and storms where exposed?
Fall Protection
-
Fall Protection safety and installation plan communicated to crew?
-
Fall Arrest equipment use and configuration correct?
-
Pre-engineered fall protection systems used correctly & in good condition?
-
Employee trained for fall protection? 1926.503
-
Elevations higher than 6' protected by guardrail, net, or personal fall arrest system? 1926.501(b)(1)
-
No employee working closer than 15' of a leading edge? 1926.501(b); 502(b) & letter of interpretation Troxell 2000
-
Warning line systems erected around perimeter of leading edge 15' away? Letter of interpretation Steigerwald 2005
-
2" diameter holes and larger securely covered, marked, and able to withstand 200% expected load.
-
Toe boards installed when exposure higher than 6' to prevent falling objects?
Scaffolds
-
Scaffold contains only manufacturer designed components (no mixing without approval)? 1926.451(b)(10)
-
Scaffold on stable ground with base plates and mud sills or other firm foundation? 1926.451(c)(2)
-
Scaffold not erected higher than 4 times the minimum base width without tie backs? 1926.451(c)(1)
-
Scaffold as fully planked as possible? 1926.451(b)(1)(i-ii)
-
Supported scaffold poles, legs, posts, frames, and uprights <br>shall be plumb and braced. 1926.451(c)(3)
-
Fully guard railed when at or over 6' in height?
Power Tools
-
Assured Grounding check in current quarter or GFCI in use? 1926.302(a)(1)
-
Power tools designed to have a guard shall have them equipped. 1926.300(b)(1).
-
Only trained employees are operating powder actuated tools? 1926.302(e)
-
All hand and power tools shall be maintained in a safe condition. 1926.300(a)
-
Lock Out Tag Out procedures used for defective tools? 1926.302(e)(3)
-
Are tools deenergized when being serviced?
-
Case & switches in good shape and operate freely? 1926.300(d)
Rigging & Crane Use
-
A qualified rigger is conducting a daily inspection? 1926.753(c)(2) & 1926.251.
-
Operator has the authority to stop work when there is a safety concern. 1926.1418
-
Crane is a safe distance from power lines? 50 feet with load. 1926.1409(a) or 20 feet without load? 1926.1411
-
Operator has been trained and has a certification card. Full law in effect November 10, 2017. 1926.1427
-
Operator lifting below 75%, no tandem or other critical picks without approved written plan.
-
A tag or restraint line must be used if necessary to prevent rotation of the load that would be hazardous. 1926.1417(w)
-
Annual Crane inspection completed and documentation reviewed? 1926.1412(f)(1) & 1926.1412(f)(7)(i & ii).
-
Operators manual, load charts, and warnings must be readily available in the operators cab at all times. 1926.1417(c)(1).
-
The operator remains at the controls while the load is suspended unless all exception criteria met. 1926.1417(e)(1)
-
Rigging hardware and slings used correctly and within capacity? 1926.251(a)(2)(ii).
-
Rigging equipment has permanent legible identification markings for capacity and manufacturer. 1926.251(a)(2)(i).
Fire protection
-
Clear egress out of the building? 1926.34(a)
-
Fire extinguishers are in good condition and periodically inspected? 1926.150(a)(4)
-
Fire extinguishers inspected annually? 1926.150(c)(1)(viii)
-
Fire extinguishers are available throughout the project? <br>Minimum 1 per floor, adjacent to stairs, within 100 feet. 1926.150(c)(1)(i&iv).<br>
-
Fire protection and prevention program or "hot work" plan is in place? 1926.24<br>
-
When welding, cutting, or heating operation may cause a fire despite controls in place, additional personnel will act as a "fire watch". 1926.352(e)
-
Cylinders protected appropriately?
-
Containers labeled?
-
Safety cans used for flammable liquids?
-
Flash Arrestor in safety cans containing flammable liquid?
Ladders and stairs
-
Extension ladder 3 rungs above roof? 1910.25(d)(2)(xv)<br>
-
Ladders are setup correctly. Stable, fully open, secured. 1926.1053(b)(4)
-
Employees are maintaining 3 points of contact when climbing a ladder? 1926.1053(b)(21)
-
Ladders are in good condition? No broken, cracked, or missing parts? 1926.1053(b)(16)
-
No employee is standing on or straddling the top step. 1926.1053(b)(13)
-
Stairs having four or more risers or rising more than 30 inches shall have at least one handrail. 1926.1052(c)(1)<br>
-
Pans are level and filled or concrete poured. 1926.1052(b)(1-3)
Powered Machinery
-
Inspections completed daily at start of shift? 1926.601(b)(14). <br>
-
Backup alarms or spotter is in use or clear view to the rear? 1926.601(4)
-
Machine being used for its intended use?
-
Safety devices on machines are being utilized?
-
Manufacturer approved attachments?
-
Are they documented by the responsible party?
-
Attachments Secured from movement.
-
Powered industrial truck operator has training certification within three years. 1910.178(I)(4)(iii).
Electrical Safety
-
Electrical panels/circuits are effectively enclosed? 1926.405(b)(1)
-
Electrical panels are labeled.
-
Conductors entering boxes/cabinets are protected from abrasion? 1926.405(b)(1)
-
Extension cords have the ground pin intact? 1926.404(f)(6)
-
Temporary power connections using GFCI? 1926.404(b)(1)(ii)<br>
-
Extension cords are not worn, frayed, or otherwise damaged? 1926.416(e)(1)
-
Light bulbs protected from accidental breakage? 1926.405(a)(2)(ii)(E)
-
All sockets in temporary lighting have bulbs? 1926.416(a)(1)
Confined Spaces
-
All confined spaces are labeled as such?
-
Only permitted employees are entering confined spaces?
-
All necessary members of the confined space team are present? (Confined space supervisor, confined space attendant, confined space entrant)
-
Confined space has had pre-entry air testing done?
-
Confined space has constant air monitoring while there is an entrant in the space?
-
Confined space rescue plan is in place and proper equipment is present?
Lock out/ Tag out
-
LOTO procedure is in place?
-
Each employee/crew working on the system has their lock on the system?
Concrete/ Masonry
-
Rebar guarded to prevent impalement? 1926.701(b)
Silica Exposure Control Plan
-
Control of dust containing silica?
-
If applicable, what materials are being used in which Silica dust could be present?
-
Does the plan to control silica dust comply with OSHA's table 1 in the silica standard?
Near Misses
-
Has job site remained "near miss" free from any occurrence
-
Do employees understand the definition?
-
Are employees active identifying near misses and solutions?
Uncommon Issues
-
Other (not listed on audit)
-
Auditor Signature