Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Have the corrective actions from the previous audit been completed?
-
Have all medium or high risk corrective actions been completed since the last visit?
Project Documentation
-
Does this project exceed 30 working days or 500 person days?
-
Is the project notifiable under CDM
-
Is the F10 notification on display and signed by the client?
-
Is the construction phase Health and Safety Plan on site and available for review?
SHE File/ Safety Notice Boards
-
Is the Health and Safety Law Poster available?
-
Is the Health and Safety Policy Statement available?
-
Is there a Environmental Policy Statement available?
-
Is the company insurance certificate displayed?
Risk Assessments and Method Statements
-
Are there RAMS available for all activities
-
Have all operatives signed off the confirmation sheet to show communication of the RAMS?
-
Do operatives working practices follow the method of work and RAMS?
-
Do the RAMS adequately control the risk?
-
Are COSHH substances used on site?
-
Are MSDS and COSHH assessments available for all substances?
Training and Competence
-
Does the site manager hold a SSSTS or SMSTS qualification?
-
Have all operatives received site induction training?
-
Are regular Tool Box Talks undertaken?
Asbestos
-
Has an asbestos survey been undertaken of the building?
Fire and Emergency Precautions
-
Is there a register of people on the site for accountability and evacuation purposes?
-
Has a fire risk assessment been undertaken for the project?
-
Has a fire emergency plan been developed for the site?
-
Are fire points clearly marked and have the appropriate firefighting equipment?
-
Has a muster point been established and have the appropriate notice?
Working at height
-
Is temporary scaffolding used on site?
-
Is it erected by a competent contractor (PASMA qualified)?
-
Is a Scaff-tag system or something similar used?
-
Has it been inspected within the last seven days or after inclement weather or modification?
-
Are all platforms fully boarded?
-
Are double handrails provided at all working platforms and at the correct height?
-
Are all access ladders in good condition and secured?
-
Are MEWPS or Scissor lifts used on site?
Confined Space Work
-
Is there any confined space work undertaken?
-
Are the individuals competent to undertake this work and are the risks controlled?
Lifting Equipment
-
Is there any lifting equipment used on site?
-
Is all lifting equipment subject to a thorough examination LOLER at 12 month intervals?
Work Equipment
-
Do inspections of work equipment occur at regular intervals?
-
Is there some form of defect reporting?
-
Is there evidence of electrical testing (PAT)
-
Does the work equipment appear to be in good order?
Manual Handling
-
Have the manual handing risks been identified and controlled?
Noise and Vibration
-
Are there any operations that expose individuals to excessive noise levels and are those exposures controlled?
-
Are there any activities that expose individuals to excessive levels of vibration and are those levels controlled.
Welfare Facilities
-
Are there suitable and sufficient toilets and washing facilities available?
-
Is there an area for eating food and making drinks, is it clean and tidy?
-
Is there a supply of fresh drinking water?
First Aid and Accident/ Incident Reporting
-
Is there sufficient trained first aiders on site?
-
Is there suitable and sufficient first aid kits available, are they checked regularly?
-
Is suitable eye wash available and in date?
-
Is there a method for recording accidents and incidents?
-
Has there been any accidents or incidents since the last visit?
-
Has there been any RIDDOR accidents or incidents on this project and have they been investigated?
Waste Management
-
Are waste transfer notes available for all skips leaving the site?
-
Is all food waste removed in a timely manner to remove rodent infestations?
-
Is all waste removed from working areas to prevent build up?
General
-
Is the general housekeeping up to standard?
-
Are all operatives wearing the appropriate PPE when required?
Corrective Actions Required
-
High Risk
-
Select date
-
Medium Risk
-
Low Risk
-
Signed Site Representative
-
Signed Safety Advisor