Title Page

  • Site conducted

  • Conducted on

  • Prepared by

Checklist

SITE SAFETY PROGRAM – System Review

  • a) Clear communication of safety information.

  • b) Safety Manual* accessible to employees, up to date, and all supervisors aware of manual location.<br>*This may be a site/ business specific manual, or this DSM

  • c) Key Risk Register up to date and identifies Dealerships key risks (see Section 5)

  • d) Safety Business Plan updated and approved by DP. Sample in Section 5.

  • e) Safety committee (or site equivalent) meets at least 3 monthly. Comprised of at least 50% staff and represents all departments.

  • f) Safety training completed for all employees and logged on training register. Department Managers are keeping the Register up to date. See section 9 for sample register and skills matrix.

  • g) Hazard/ Incident reporting system in place and working correctly.

  • h) Visitor & contractor procedure in place<br>Samples in Section 18

  • i) Emergency risk assessment updated with workplace changes, including emergency procedures & evacuation plan <br><br>Emergency Risk Assessment form in Section13

  • j) High risk tasks or activities controlled by permit to work system.

  • k) Internal audit of safety program conducted annually

  • l) External audit of safety program conducted at least 5 yearly

  • m) Safety Inspections completed per schedule Section 10 of Dealer Safety Manual

  • n) Safe Work Procedures available for routine tasks and JSA for non-routine Section 16 of Dealer Safety Manual

  • o) Plant and Equipment safe and used for intended purpose. See sections 14 and 24.

  • p) Chemical Safety; chemical register available, SDSs (Safety Data Sheets) available for all chemicals, and risk assessment where required. Manifest (if >2500L fuel held on site) See section 17 for details

PHYSICAL WORKPLACE

  • a) Workplace assessments conducted e.g. noise assessment within 5 years, asbestos within 3 years. If required see standards in Section 12 & 19

  • b) Roof anchor points (if applicable) within maintenance, service, and inspection periods

  • c) Lighting survey conducted with major workplace changes. To verify adequate lighting relevant to tasks.

  • d) Automatic doors and lifts etc. all serviced and maintained per manufacturers recommendations.

  • e) Stairs, ladders, and walkways reviewed with major changes to the work area. To align with Australian Standards. See checklist in Section 19

  • f) Traffic Management Plan developed and up to date (within last 5 years or last major change to site). See details in Section 19

  • g) Electrical safety – all items in hostile environment tested, tags in date. Prestart task checks include verifying cords in good condition.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.