Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1.0 - Previous inspection

  • 1.1 - Has the last inspection been reviewed?

  • 1.2 - Are there no outstanding actions?

2.0 - Safety

  • 2.0 - Pre start sighted and correct

2.1 - Induction and briefings

  • 2.11 - All staff have been inducted on site

  • 2.12 - Pre work brief has been undertaken by supervisor

  • 2.13 - Site and work tasks are adequately supervised.

2.2 - SWMS

  • 2.21 - Work at site is undertaken in accordance with the SWMS

  • 2.22 - pSWMS has been signed by those undertaking the works

2.3 - PPE

  • 2.31 - All site people wear high vis ability vests ( Orange in rail corridor

  • 2.32 - Helmets / hard hats are being worn

  • 2.33 - Safety foot ware is being worn

  • 2.34 - Eye protection is being worn

2.4 - Emergencies

  • 2.41 - Emergency / first aid procedures in place

  • 2.42 - Emergency access is clear

  • 2.43 - Are site personnel clear on emergency evacuation

  • 2.44 - Is there a first aid kit on site.

  • 2.45 - Is the first aid person displayed

2.5 - Work Areas

  • 2.51 - Work areas are clean and tidy , clear of slip hazards and exits clear from obstructions

  • 2.52 - Storage areas are secured , including dangerous goods storage and hazardous equipment and safety data sheets ( SDS )<br><br>

  • 2.53 - Penetrations are sign posted and guarded

  • 2.54 - A hazardous material register is available

  • 2.55 - Asbestos or lead paint removal work plans or permits are available on site

  • 2.56 - Demarcated exclusion zones with signage in place / correct type of barricading is it fit for purpose

  • 2.57 - Correct PPE being worn

  • 2.58 - Are leads off the ground in correct stands or hooks

  • 2.59 - Chemical containers are labelled and stored in bunded areas or pallets

2.5 - Work Areas

  • 2.51 - Work areas are clean and tidy , clear of slip hazards and exits clear from obstructions

  • 2.52 - Storage areas are secured , including dangerous goods storage and hazardous equipment and safety data sheets ( SDS )<br><br>

  • 2.53 - Penetrations are sign posted and guarded

  • 2.54 - A hazardous material register is available

  • 2.55 - Asbestos or lead paint removal work plans or permits are available on site

  • 2.56 - Demarcated exclusion zones with signage in place / correct type of barricading is it fit for purpose

  • 2.57 - Correct PPE being worn

  • 2.58 - Are leads off the ground in correct stands or hooks

  • 2.59 - Chemical containers are labelled and stored in bunded areas or pallets

2.6 - Worksite Protection

  • 2.61 - Worksite protection plan is on site and current

  • 2.62 - A protection officer is in place for the works<br>

2.7 - Traffic Management

  • 2.71 - Onsite traffic management plan is in place

  • 2.72 - Are the personnel trained or accredited

2.8 - Electrical

  • 2.81 - RCDs ( Earth leakage protection ) are in place for all electrical equipment

  • 2.82 - All portable electrical tools and equipment in good condition and tagged with the correct month

  • 2.83 - Are all leads suspended off the ground on the correct stands or hooks ( Insulated )

  • 2.84 - Do generators have RCDs

2.9 - Safe Approach Distances

  • 2.91 - Safe approach distances / electrical permit maintained

  • 2.92 - Arrangements are in place to prevent encroachment

  • 2.93 - Mobile plant operator & safety observer hold , Safe Electrical Approach for ranges and plant compentency

2.10 - Plant

  • 2.101 - Log books and inspection records are available for all plant

  • 2.102 - Plant operators has the required qualifacations

  • 2.103 - Operational flashing lights and reversing quacker is operational on mobile plant

  • 2.104 - Daily pre start checks have been completed for plant

  • 2.105 - - Exclusion zones are in place around mobile plant

2.11 - Hot Works

  • 2.111 - Hot works permit completed

  • 2.112 - Work and requirements comply with permit

  • 2.113 - Cylinders stored / fixed working upright

  • 2.114 - Grinding / Welding is protected ( face shield , fire extinguisher , spark screen , PPE )

2.12 - Working At Heights

  • 2.121 - Fall protection is in place with rescue plan

  • 2.122 - Fall prevention system ( eg harness , lanyard , static line ) is in place and inspected as required by legislation

  • 2.123 - Area below personnel working at heights is barricaded

2.13 - Ladders

  • 2.131 - Are step ladders platform type this is best practice ( platform ladders or better are the requirements )

  • 2.132 - Does all access ladders extend 1 M above deck at angle of 1 : 4 , top and bottom secured<br><br><br>

  • 2.133 - Ladders are non metallic ( fibre glass )

2.14 - Demolition

  • 2.141 - Area delineated with suitable barricading or hoarding

  • 2.142 - Are services isolated in area

  • 2.143 - Is noise monitoring required

3.0 - Quality

  • 3.1 -

  • 3.2 -

  • 3.3 -

  • 3.4 -

  • 3.5 -

  • 3.6 -

  • 3.7 -

  • 3.8 -

  • 3.9 -

4.0 - Environmental

5.0 Heritage

6.0 - Works in progress at time of inspection

Sign Off

  • On site representative

  • Auditor's signature

Plant

Plant

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.