Information

  • Conducted on

  • SWD NAME

  • Supervisor

  • Supervisors Participation

  • Auditor

A - TANK CONDITION

A - TANK CONDITION

  • A1 - Are tanks equipped with high level alarms?

  • A2 - Are tanks equipped with a high level shutdown?

  • A3 - Are there any noticeable leaks, potential leaks, or staining?

  • A4 - Are the tanks and piping painted?

  • A5 - Are tanks level and on adequate foundation?

  • A6 - Are there any open top tanks on location? (Inf.)

  • A7 - Are the open top tanks protected with bird netting?

B - TANK LABELING

B - TANK LABELING

  • B1 - Are tanks labeled with Hazard Communication labels?

  • B2 - Are tanks labeled to identify the contents of each tank?

C - THIEF HATCHES

C - THIEF HATCHES

  • C1 - Is each tank equipped with a latching thief hatch, and is it secured?

  • C2 - Is the thief hatch spring in good condition?

  • C3 - Is the thief hatch gasket in good condition?

  • C4 - Is adequate access to each thief hatch provided?

D - HYDROGEN SULFIDE

D - HYDROGEN SULFIDE

  • D1 - Is an H2S site assessment required by state law (Inf.)?<br>(If "YES" see question is Section AG1)

  • D2 - Do the tanks have stationary H2S monitors? (Inf.)

  • D3 - Is breathing equipment required when gauging the tanks? (Inf.)

  • D4 - If breathing equipment is required is stairway and catwalk access secured and are warning signs posted?

E - WINDSOCK

E - WINDSOCK

  • E1 - Does the facility have a visible wind directional indicator?

  • E2 - Is the indicator mounted on top of the tanks?

  • E3 - Is the indicator pole lower than the highest static dissipator?

  • E4 - Can the indicator be seen from any place in the facility?

  • E5 - Is the condition of the wind indicator satisfactory?

F - VENTS

F - VENTS

  • F1 - Do the vent lines terminate inside the containment dike?

  • F2 - Vent endpoints greater than 25' from nearest tank?

  • F3 - Are the vent lines equipped with a flame arrestor?

  • F4 - Are vent lines adequately supported (no sag)?

G - STAIRWAYS AND WALKWAYS

G - STAIRWAYS AND WALKWAYS

  • G1 - Are stairs and walkways in good condition?

  • G2 - Are stairs and walkways painted or galvanized?

  • G3 - Are railings equipped with middle rails and toe boards?

  • G4 - Are there any gaps over 4” in the railings?

H - GUN BARREL

H - GUN BARREL

  • H1 - Is gun barrel equipped with a water leg?

  • H2 - Is the gun barrel operation automatic?

  • H3 - Are fluids pumped into the bottom of the gun barrel?

  • H4 - System has at least 2 hours of residence time for fluids?

  • H5 - Is the gun barrel properly vented including a flame arrestor?

I - OIL TANKS

I - OIL TANKS

  • I1 - Does oil gravity flow into tanks from gun barrel?

  • I2 - Are tanks equipped with stairs and walkways?

  • I3 - Can water be drained from the bottom of the oil tanks?

  • I4 - Load lines locked and sealed with numbered metal seals?

  • I5 - All valves/hatches locked/sealed with numbered metal seals?

J - DIKE SYSTEM

J - DIKE SYSTEM

  • J1 - Is the dike constructed of rock, clay, caliche, concrete, or a similar material?

  • J2 - Are all dikes in good condition?

  • J3 - Are stairways over the dike provided and used?

  • J4 - Is plastic liner installed inside diked area? (Inf.)

  • J5 - If there is a liner is the liner free from damage?

  • J6 - Liner protected w/sand or other material where appropriate?

  • J7 - Diked area free of weeds, trash, junk or empty barrels?

  • J8 - Will dike contain 110% of all enclosed tank capacities?

  • J9 - Is the inside of the dike free of saltwater and oil contaminated soil?

K - PITS

K - PITS

  • K1 - Does facility have a collection pit? (Informational)

  • K2 - Does facility have a washout pit? (Informational)

  • K3 - Are the pits lined?

  • K4 - Do the pits have a leak detection system? (Informational)

  • K5 - Are the pits cleaned, inspected & maintained as per permitting?

  • K6 - Pits covered with netting to prevent birds from entering?

L - CATCH BASINS

L - CATCH BASINS

  • L1 - Are catch basins provided at loading/unloading points?

  • L2 - Standing liquids in catch basins are as low as practicable?

  • L3 - Are catch basins installed below ground level? (Inf.)

  • L4 - Are catch basins protected with expanded metal covers?

  • L5 - Is the area around all catch basins and spill prevention devices free of oil stained soil?

M - LOADING/UNLOADING

M - LOADING/UNLOADING

  • M1 - Can the systems high level warning device be seen and/or heard from the loading/unloading station?

  • M2 - Can the systems high level shutdown device be seen and/or heard from the loading/unloading station?

  • M3 - Do trucks ground before loading/unloading?

  • M4 - Are grounding leads and clamps available OR are specific grounding points identified for trucks to connect to and is condition acceptable?

  • M5 - “Grounding Required” displayed at the unloading station?

  • M6 - Are there any visible leaks present?

N - SUMPS

N - SUMPS

  • N1 - Is the sump located inside the diked area?

  • N2 - Is standing liquid in the sump is as low as practicable?

  • N3 - Have a functional pump with automatic level control?

  • N4 - Sump wiring suitable for Class 1, Group D, Div. 1?

  • N5 - Is the sump opening adequately guarded and covered?

  • N6 - Is the sump in good physical condition?

O - WELLHEAD

O - WELLHEAD

  • O1 - Wellhead have a visible sign with applicable information (lease number, well number, company name)?

  • O2 - Is the well head fenced, diked, or placed inside a firewall to protect from inadvertent damage?

  • O3 - Is the wellhead diked to control spills?

  • O4 - Is a check valve installed at the well head to prevent backflow?

  • O5 - Injection line supported to prevent leverage on the wellhead?

  • O6 - Are injection hoses hobbled correctly?

  • O7 - Is the area around the wellhead free of stained soil?

P - INJECTION

P - INJECTION

  • P1 - Functional pressure gauge with isolation valve on tubing?

  • P2 - Functional pressure gauge with iso valve on each annulus?

  • P3 - Is injection fluid filtered before injection?

Q - PIPING, VALVES, AND FITTINGS

Q - PIPING, VALVES, AND FITTINGS

  • Q1 - Pipes, valves, and fittings designed for operating conditions?

  • Q2 - Is the facility free of white or gray PVC piping?

  • Q3 - Is piping adequately supported and anchored with clamps?

  • Q4 - Are valves free of visible signs of leaks?

  • Q5 - Are connections free of visible signs of leaks?

R - PUMPS (Centrifugal and Rotary)

R - PUMPS (Centrifugal and Rotary)

  • R1 - Piping & connections designed for max allowable pressures?

  • R2 - Are the discharge lines equipped with check valves?

  • R3 - Are the pumps free of visible signs of leaks?

  • R4 - Are couplings and rotating shafts adequately guarded?

  • R5 - Are electric motors properly grounded (<5 ohms resistance)?

S - PUMPS (High Pressure: >5000PSI)

S - PUMPS (High Pressure: >5000PSI)

  • S1 - Pressure sensing devices to identify primary seal failure?

  • S2 - Equipped with pressurized oil system for bearing lubrication?

  • S3 - Is the pump equipped with a low lube oil pressure shut down?

  • S4 - Equipped with adequate belt and coupling guards?

  • S5 - Is the pump and electrical motor (if applicable) externally grounded (5 ohms or less resistance)?

  • S6 - Pump is free of excessive vibration?

  • S7 - Equipped with a pulsation dampener on the discharge line?

  • S8 - Pump is free of indications of water leaks?

  • S9 - Pump is free of indications of oil leaks?

  • S10 - Is the pump skid adequately anchored?

  • S11 - Is the pump installed inside the diked area?

  • S12 - Does the pump have a pressure relief valve, OEM shear pins, and is piped into a safe area?

T - ELECTRICAL

T - ELECTRICAL

  • T1 - Is electrical wiring inside of Class 1 Div 1/Div 2 areas enclosed in metal conduit?<br>

  • T2 - Fixtures meet electrical standard described in SWD Op. Man./ NEC/ API RP 505?<br>

  • T3 - Explosion proof covers secured with screws, bolts & clamps?<br>

  • T4 - Seals in conduit if <18” of enclosures in C1 D1 & D2 locations?

U - ELECTRICAL MOTOR

ELECTRICAL MOTOR

  • U1 - Motors in a Class 1, Div. 1 classified area explosion proof?

  • U2 - Motors in a Class 1, Div. 2, classified area TEFC?

  • U3 - Are all electric motors externally grounded (<5 ohms)?

V - CONTROL TRANSFORMERS

V - CONTROL TRANSFORMERS

  • V1 - Control transformer(s) located inside the diked area are Class I Div. 2 or Div. 1 ?

  • V2 - Control transformers in non classified areas are closed and protected?

W - FLEXIBLE CORDS

W - FLEXIBLE CORDS

  • W1 - Are the diked areas free of extension cords?

  • W2 - Are flexible cords in Class 1 locations >3 ft. in length, in good condition, and supported?

  • W3 - Is electrical heating tape used within the facility? (Inf.)

  • W4 - If yes, does the tape satisfy NEC/RP 505 requirements?

X - LIGHTING

X - LIGHTING

  • X1 - Is the facility adequately lighted?

  • X2 - Diked area lights meet standards described in SWD Op. Man.?

Y - GROUNDING

Y - GROUNDING

  • Y1 - Generator housing?

  • Y2 - Metal enclosures for motor controllers & circuit breakers?

  • Y3 - Metal enclosures for switchgear & transformers?

  • Y4 - Metal buildings?

  • Y5 - Vessels and tanks?

  • Y6 - Steel valves/fittings in fiberglass piping and on fiberglass tanks?

  • Y7 - Is the facility equipped with lightning protection?

  • Y8 - Are the lightning protection conductors connected to all tanks, valves, hatches, dissipators, and earth grounds?

Z - HOUSEKEEPING

Z- HOUSEKEEPING

  • Z1 - Facility free of weeds, trash, clutter and empty containers?

  • Z2 - Buckets/drums that contain fluid stored inside secondary?

  • Z3 - Has junk and abandoned equipment been removed?

  • Z4 - Are tools & equipment properly stored?

  • Z5 - Secondary containment free of debris and standing fluid?<br>

  • Z6 - Do all trash bins have lids and are they closed when not in use?

  • Z7 - Is the facility free of oil/saltwater stained soil in areas outside dikes?

AA - SECURITY

AA - SECURITY

  • AA1 - Protected from unauthorized access to loading/unloading?

  • AA2 - Fence & locked gate to deter unauthorized persons?

  • AA3 - Are keys issued to drivers for access? (Informational)

  • AA4 - Is there a record of drivers who have keys?

  • AA5 - Can the keys be duplicated?

  • AA6 - Attendant onsite 24-hours a day? (Inf.)

  • AA7 - Does the facility have an electronic access system? (Inf.)

  • AA8 - Is the facility equipped with a burglar alarm? (Inf.)

  • AA9 - Security camera system monitored 24-hours a day? (Inf.)

  • AA10 - Fire extinguishers <75 ft. from any point within the facility?

  • AA11 - Extinguishers charged, maintained, tagged, and inspected?

AB - FACILITY SIGNS

AB - FACILITY SIGNS

  • AB1 - Is the SWD permit sign present and legible (Well name, Facility Identification, SWD RRC Permit Number)?

  • AB2 - Are no smoking signs present and legible?

  • AB3 - Are automatic start signs present and legible?

  • AB4 - Are exit signs present and legible?

  • AB5 - Are PPE requirement signs present and legible?

  • AB6 - Are signs identifying high voltage present and legible?

  • AB7 - Are authorized personnel signs present and legible?

  • AB8 - Are cell phones prohibited signs present and legible?

  • AB9 - Are emergency notification signs present and legible?

AC - TESTING OF ALARMS AND SHUTDOWNS

AC - TESTING OF ALARMS AND SHUTDOWNS

  • AC1 - Alarm tests and calibration records available for review?

AD - NORM

NORM

  • AD1 - Are precautions taken to prevent NORM contamination of equipment and property (ex. regular cleanouts)?

  • AD2 - Has the location ever had a NORM survey?

  • AD3 - Is known NORM containing equipment labeled at potential access area?

AE - SPCC

SPCC

  • AE1 - Is the facility SPCC plan accessible during business hours?

  • AE2 - Is the facility SPCC plan reviewed annually and updated as needed? <br>

  • AE3 - Have recommendations from facility plan been implemented? <br>

  • AE4 - If not implemented, is there a schedule for plan recommendation implementation? <br>

  • AE5 - Is the Key storage tank inspection policy followed? <br>

AF - SWPP

SWPP

  • AF1 - Is the facility SWPP plan accessible during business hours?

  • AF2 - Are plan requirements being followed?

  • AF3 - Are all stormwater permits accessible during business hours?

  • AF4- Is SWPP plan reviewed annually and updated as needed? <br>

  • AF5 - Have corrective actions from facility plan been implemented?

  • AF6 - If not implemented, is there a schedule for plan recommendation implementation?

AG - Documentation

Documentation

  • AG1 - If an assessment is required, is a copy of the H2S documentation available?

  • AG2 - Do all seals match the skim oil sales control log?

  • AG3 - Copies of pit permits are available for review?

  • AG4 - Are pit maintenance & inspection records available for review?

  • AG5 - Are all pit permit requirements followed?

  • AG6 - Are tubing and annuli pressures recorded daily?

  • AG7 - Is a copy of last well test (H5) available?

  • AG8 - Is a copy of SWD injection permit available? <br>

  • AG9 - Is the facility in compliance with injection permit? <br>

  • AG10 - Is the Key HAZCOM plan for the facility readily accessible?

  • AG11 - Are Safety Data Sheets available for chemicals that are used/stored at the facility?

  • AG12 - Are routine inspections for small leaks and spills conducted, and identified leaks and spills cleaned up?

  • AG13 - Have underground storage tanks been removed from the location?

  • AG14 - Are standing fluids inside dikes visually inspected prior to discharge or properly disposed of?

  • AG15 - Is the facility free of violations and/or citations during the last year?

  • AG16 - Is the facility free of reportable spills during the last year? <br>

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.