Information
-
Site conducted
-
Document No.
-
Audit Title
-
Factory
-
Department / Division
-
Inspection Date
-
Inspected by
-
Accompanied by
1. Locker / Changing Room
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Ceiling & Lighting
-
Commitment Date & PIC
-
d) Door & Windows
-
Commitment Date & PIC
-
e) Locker
-
Commitment Date & PIC
-
f) Fan
-
Commitment Date & PIC
-
g) Trash Bin
-
Commitment Date & PIC
-
h) Shoes Rack
-
Commitment Date & PIC
-
i) Bench
-
Commitment Date & PIC
-
j) Floor Mat / Carpet
-
Commitment Date & PIC
-
k) Sticky Roller Board
-
Commitment Date & PIC
-
l) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
m) Others
-
Commitment Date & PIC
2. Handwashing Area Entrance
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Ceiling & Lighting
-
Commitment Date & PIC
-
d) Door
-
Commitment Date & PIC
-
e) Hand Washing Sink & Pipe
-
undefined
-
f) Mirror
-
Commitment Date & PIC
-
g) Fan
-
Commitment Date & PIC
-
h) Hand Dryer
-
Commitment Date & PIC
-
i) Water Pipe
-
Commitment Date & PIC
-
j) Plastic Strip Curtain
-
Commitment Date & PIC
-
k) Floor Mat / Carpet
-
Commitment Date & PIC
-
l) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
m) Others
-
Commitment Date & PIC
3. Chemical Room
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Ceiling & Lighting
-
Commitment Date & PIC
-
d) Door
-
Commitment Date & PIC
-
e) Rack
-
Commitment Date & PIC
-
f) Material Arrangement
-
Commitment Date & PIC
-
g) Utensils (Cleaning tools, karcher, scrapper, brush etc.)
-
Commitment Date & PIC
-
h) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
i) Others (PPE storage& condition, etc.)
-
Commitment Date & PIC
4. Washing Area
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Ceiling & Lighting
-
Commitment Date & PIC
-
d) Sink & Bench
-
Commitment Date & PIC
-
e) Pipe
-
Commitment Date & PIC
-
f) Door
-
Commitment Date & PIC
-
g) Trash Bin
-
Commitment Date & PIC
-
h) Ventilation (Wire mesh at wall)
-
Commitment Date & PIC
-
i) Drainage
-
Commitment Date & PIC
-
j) Hot Water Tank
-
Commitment Date & PIC
-
k) Material & Cleaning Tools Arrangement
-
Commitment Date & PIC
-
l) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
m) Others
-
Commitment Date & PIC
5. Butter Waffles Mixing Room
-
a) Floor
-
Commitment Date & PIC
-
b) Wall & Notice Board
-
Commitment Date & PIC
-
c) Control Panel
-
Commitment Date & PIC
-
d) Ceiling & Lighting
-
Commitment Date & PIC
-
e) Door / Sliding Door & Window
-
Commitment Date & PIC
-
f) Fan
-
Commitment Date & PIC
-
g) Dustbin
-
Commitment Date & PIC
-
h) Utensils (Scoop, scrapper, dough pail, metal tray,etc.)
-
Commitment Date & PIC
-
i) Equipments
-
Commitment Date & PIC
-
j) Air Conditioner Room
-
Commitment Date & PIC
-
k) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
l) Others
-
Commitment Date & PIC
6. Butter Waffles Oven Area
-
a) Floor
-
Commitment Date & PIC
-
b) Wall / Notice Board
-
Commitment Date & PIC
-
c) Control Panel
-
Commitment Date & PIC
-
d) Ceiling & Lighting
-
Commitment Date & PIC
-
e) Ventilator Fan
-
Commitment Date & PIC
-
f) Door
-
Commitment Date & PIC
-
g) Equipment (Dough hopper, Wire mesh conv., Cutter, dough roller, nozzle)
-
Commitment Date & PIC
-
h) Utensils
-
Commitment Date & PIC
-
i) Others (Air compressor, piping, etc.)
-
Commitment Date & PIC
-
j) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
k) Others
-
Commitment Date & PIC
7. Wafer Book Oven Area
-
a) Floor
-
Commitment Date & PIC
-
b) Wall, Divider & Notice Board
-
Commitment Date & PIC
-
c) Control Panel
-
Commitment Date & PIC
-
d) Ceiling & Lighting
-
Commitment Date & PIC
-
e) Wafer Book Cooler
-
Commitment Date & PIC
-
f) Sliding Door
-
Commitment Date & PIC
-
g) Dehumidifier
-
Commitment Date & PIC
-
h) Utensils
-
Commitment Date & PIC
-
i) Equipment (Cutter, dividing table, wire mesh conv., metal detector, etc.)
-
j) Moveable Stairs
-
Commitment Date & PIC
-
k) Ventilation (Fan, air conditioner, etc.)
-
Commitment Date & PIC
-
l) Plastic Strip Curtain
-
Commitment Date & PIC
-
m) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
n) Others
-
Commitment Date & PIC
8. Wafer Roll Oven Area
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Door
-
Commitment Date & PIC
-
d) Ceiling & Lighting
-
Commitment Date & PIC
-
e) Ventilation (Blower, Fan, etc)
-
Commitment Date & PIC
-
f) Utensil (Water tank, tube, scrapper, spindle, etc.)
-
Commitment Date & PIC
-
g) Equipment (Oven, conveyer, double deck conveyer, etc.)
-
Commitment Date & PIC
-
h) Batter Pump Station
-
Commitment Date & PIC
-
i) Stair
-
Commitment Date & PIC
-
j) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
k) Others
-
Commitment Date & PIC
9. Cream Preparation Area
-
a) Floor
-
Commitment Date & PIC
-
b) Wall & Control Panel
-
Commitment Date & PIC
-
c) Ceiling & Lighting
-
Commitment Date & PIC
-
d) Ventilation (Fan, Blower)
-
Commitment Date & PIC
-
e) Trolley
-
Commitment Date & PIC
-
f) Dustbin
-
Commitment Date & PIC
-
g) Racks
-
Commitment Date & PIC
-
h) Weighing Bridge
-
Commitment Date & PIC
-
i) Utensils
-
Commitment Date & PIC
-
j) Equipments (Vibration sifter, ball mill, GTP mixer, tempering tank, etc.)
-
Commitment Date & PIC
-
k) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
l) Others
-
Commitment Date & PIC
10. Sugar Grinding Room
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Ceiling & Lighting
-
Commitment Date & PIC
-
d) Door
-
Commitment Date & PIC
-
e) Equipment
-
Commitment Date & PIC
-
f) Sugar Tub
-
Commitment Date & PIC
-
g) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
h) Others
-
Commitment Date & PIC
11. Cold Room
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Ceiling & Lighting
-
Commitment Date & PIC
-
d) Door
-
Commitment Date & PIC
-
e) Plastic Strip Curtain
-
Commitment Date & PIC
-
f) Material Arrangement (Allergen/Non-Allergen) & Rack
-
Commitment Date & PIC
-
g) Panel Box (Outside Cold Room)
-
Commitment Date & PIC
-
h) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
i) Others
-
Commitment Date & PIC
12. Loading Bay (Ground Floor & First Floor)
-
a) Shutter Door
-
Commitment Date & PIC
-
b) Floor
-
Commitment Date & PIC
-
c) Ceiling
-
Commitment Date & PIC
-
d) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
e) Others
-
Commitment Date & PIC
13. Staircase (From Production to Raw Mat. Store)
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Ceiling
-
Commitment Date & PIC
-
d) Lighting
-
Commitment Date & PIC
-
e) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
f) Others
-
Commitment Date & PIC
14. Raw Material Storage Area
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Ceiling & Lighting
-
Commitment Date & PIC
-
d) Door
-
Commitment Date & PIC
-
e) Materials Arrangement
-
Commitment Date & PIC
-
f) Weighing Scales
-
Commitment Date & PIC
-
g) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
h) Others
-
Commitment Date & PIC
15. Minor Ingredient Weighing & Preparation Room
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Ceiling & Lighting
-
Commitment Date & PIC
-
d) Racks/ Shelves
-
Commitment Date & PIC
-
e) Utensils (Scoop, bottles, scrapper, etc.)
-
Commitment Date & PIC
-
f) Plastic Container
-
Commitment Date & PIC
-
g) Door
-
Commitment Date & PIC
-
h) Material Arrangement
-
Commitment Date & PIC
-
i) Raw Materials Condition
-
Commitment Date & PIC
-
j) Equipment (Robo cutter, conching machine, etc.)
-
Commitment Date & PIC
-
k) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
l) Others
-
Commitment Date & PIC
16. Batter Mixing Room
-
a) Floor / Drainage
-
Commitment Date & PIC
-
b) Wall & Notice Board
-
Commitment Date & PIC
-
c) Control Panel
-
Commitment Date & PIC
-
d) Ceiling & Lighting
-
Commitment Date & PIC
-
e) Chiller
-
Commitment Date & PIC
-
f) Sugar Syrup Tank / Water Tank
-
Commitment Date & PIC
-
g) Water Filter
-
Commitment Date & PIC
-
h) Sink
-
Commitment Date & PIC
-
i) Egg Weighing Table / Egg Weighing Scale
-
Commitment Date & PIC
-
j) Tables / Racks / Shelves
-
Commitment Date & PIC
-
k) Sugar Syrup Pipe / Water Pipe / Batter Pipe
-
Commitment Date & PIC
-
l) Utensils (Scoop, bottles, scrapper, plastic jar, etc.)
-
Commitment Date & PIC
-
m) Equipments (Vibration sifter, mixer, etc.)
-
Commitment Date & PIC
-
n) Trolley / Pallet Truck
-
Commitment Date & PIC
-
o) Ventilation (Air cond., blue filter)
-
Commitment Date & PIC
-
p) Door & Windows
-
Commitment Date & PIC
-
q) Raw Materials Condition
-
Commitment Date & PIC
-
r) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
s) Others
-
Commitment Date & PIC
17. Packaging Material Store
-
a) Floor
-
Commitment Date & PIC
-
b) Ceiling
-
Commitment Date & PIC
-
c) Wall
-
Commitment Date & PIC
-
d) Roof
-
Commitment Date & PIC
-
e) Pallets
-
Commitment Date & PIC
-
f) Arrangement of Material
-
Commitment Date & PIC
-
g) Material Reject Area
-
Commitment Date & PIC
-
h) Packaging Material
-
Commitment Date & PIC
-
i) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
j) Others
-
Commitment Date & PIC
18. Packing Area
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Door / Plastic Curtain Strip
-
Commitment Date & PIC
-
d) Ceiling
-
Commitment Date & PIC
-
e) Equipment
-
Commitment Date & PIC
-
f) Utensil
-
Commitment Date & PIC
-
g) Hand Washing Area
-
Commitment Date & PIC
-
h) Air Conditioner Room
-
Commitment Date & PIC
-
i) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
j) Others
-
Commitment Date & PIC
19. Packing Preparation Area
-
a) Packaging Materials
-
Commitment Date & PIC
-
b) Pallets
-
Commitment Date & PIC
-
c) Wall
-
Commitment Date & PIC
-
d) Floor
-
Commitment Date & PIC
-
e) Ceiling
-
Commitment Date & PIC
-
f) Utensils
-
Commitment Date & PIC
-
g) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
h) Others
-
Commitment Date & PIC
20. Finished Goods Store
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Pallets
-
Commitment Date & PIC
-
d) Utensil
-
Commitment Date & PIC
-
e) Finished Good Condition
-
Commitment Date & PIC
-
f) Ceiling
-
Commitment Date & PIC
-
g) Rack
-
Commitment Date & PIC
-
h) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
21. Warehouse
-
a) Floor
-
Commitment Date & PIC
-
b) Racking
-
Commitment Date & PIC
-
c) Pallets
-
Commitment Date & PIC
-
d) Lighting
-
Commitment Date & PIC
-
e) Wall
-
Commitment Date & PIC
-
f) Ceiling
-
Commitment Date & PIC
-
g) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
h) Others
-
Commitment Date & PIC
22. Rejected Biscuits Grinding Area
-
a) Condition of Rejected Biscuits
-
Commitment Date & PIC
-
b) Grinding Machine
-
Commitment Date & PIC
-
c) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
d) Others
-
Commitment Date & PIC
23. Raw Material Receiving Bay
-
a) Floor
-
Commitment Date & PIC
-
b) Ceiling
-
Commitment Date & PIC
-
c) Wall
-
Commitment Date & PIC
-
d) Condition of Glass, Ceramic & Brittle Materials
-
Commitment Date & PIC
-
e) Others
-
Commitment Date & PIC
24. Waste Disposal Area
-
a) Floor
-
Commitment Date & PIC
-
b) Shutter Door
-
Commitment Date & PIC
-
c) Others
-
Commitment Date & PIC
25. Workshop Area
-
a) Floor
-
Commitment Date & PIC
-
b) Wall
-
Commitment Date & PIC
-
c) Material Arrangement
-
Commitment Date & PIC
-
d) Others
-
Commitment Date & PIC
26. Surrounding Area
-
a) Five - Foot Way
-
Commitment Date & PIC
-
b) Guardhouse
-
Commitment Date & PIC
-
c) Toilet
-
Commitment Date & PIC
-
d) Bilik Timbang
-
Commitment Date & PIC
-
e) Hand Washing Sink
-
Commitment Date & PIC
-
f) Canteen
-
Commitment Date & PIC
-
g) Garden
-
Commitment Date & PIC
-
h) Others
-
Commitment Date & PIC
Completion
-
Remarks:
-
Reviewed by (Full name):
-