Information
-
Weekly Scaffolding Safety Tour.
-
Document No.
-
Darwen Site
-
- Crown House
- Central Maintenance
- Nimtech Buildings
- Old Main Tin Stores
- Alkyd Tank Farm
- Alkyd Pipe Bridge
- Oil paints Pre Mix
- Oil Paints Manufacturing Floor
- Oil Paints Filling
- Oil Paints Tin Stores
- Oil Paints Silos
- Any other Oil Paints related Buildings
- Emulsion Silos
- Emulsion Pre Mix
- Emulsion Manufacturing
- Emulsion Filling
- Emulsion Tin Stores
- Emulsion Powder Handling
-
Conducted on
-
-
Prepared by
-
Personnel
Safety on Externally Erected Scaffolding
-
1.-Included in the Crown Work permit system if worked on.
-
2.- Unsafe or incomplete edge protection?
-
3.- Unsafe or incomplete scaffold?
-
4.-Fall risk of 1m or more? (including voids, pits and trenches, missing or loose scaffold boards)<br>
-
5.- Unsafe or damage lifting equipment, including ropes, slings, chairs and hooks?
-
6.- Unsafe or damage harness or equipment?
-
7.- Unsafe or damage ladders?
-
8.- Unsafe position of ladders?
-
9.- Ladder not properly secured?
-
10.- Ladder unsuitable for Job?
-
11.- PPE
-
12.- Inadequate housekeeping?
Corrective Actions
-
Enter any corrective actions that will be undertaken
-
Select date
-
Add signature