Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Monday, 30 May 2022
-
Prepared For Lincolnshire Housing Partnership
-
Observation 1. Notes
-
State of building. Compliance team. Matthew. No updates. Complaint registered and Danny visiting 30.05.2022
-
Issues with guttering, moss growth, slips and trips, allegedly cleared se section, no pre arrangements made. No maintenance being wedged open, pavements most and not level
-
Grass cutting- service not adequate
-
Main reason to today's meeting is the state of repairs to the building
-
Customer first mentioned
-
Observation 2. Notes
-
Issues with laundry door and other communal doors. Some doors not secure on lock side. Laundry lock still not repaired
-
Observation 3. Notes
-
Doors overall require overhaul or replacement . Skylights to roofs, require maintenance as leaking. Decor of scheme required
-
Problems with central heating, boiler noise, check age and issues. Possibly an override issue, fans come on and make apt of noise, boilers possibly installed circa 2019
-
Water bubbling, kettling possible over spill issues
-
Communication for next steps to maintain a dialogue. Also residents request Communication and dates for nect visit. À
Observation 6
-
Missing gate to adjacent nr. 6 Sidney Taylor walk bungalow
-
Observation 4. Notes
-
Observation 5. Notes
Page 2 of 4
Observation 7
-
RWP require adjusting to terminate correctly into gulley
Observation 8
-
Location of manhole, adjacent nr 13
Observation 9
-
Carpet stain to manhole area due to previous blockage and seepage into hallway
Observation 10
-
Adjacent nr 6, communal doors not opening correctly
Observation 13
-
Exit sign requires populating