Title Page
-
Site
-
Date
-
Prepared by
-
Location
-
Instructions
1. Please answer the questions accordingly.
2. Add photos and notes by clicking on the paperclip icon
3. To add a Corrective Measure click on the paperclip icon then ""Add Action"", provide a description, assign to a member, set priority, and due date
4. Complete audit by providing digital signature
5. Share your report by exporting as PDF, Word, Excel or Web Link -
1. Work Request Number
-
2. Job Description
-
3. Priority
-
4. Photo numbers:
#Note: Photos close and at distance required to assist with parts identification and job interaction
•Photo
-
Take relevant photos
-
5. Does the defect require a temporary repair to keep plant running until parts are sourced and installed? ie. Patch a hole in a leaking pipe until new pipe is installed
-
6. List simple job steps and whether they can be completed while plant is running or shutdown, include trades required and hours to complete
•job Step
-
Specify and Provide details
-
7. Parts/materials required
•Parts/materials
-
Specify and Provide details
-
Take Relevant Photo
-
8. Equipment required
•Equipment
-
Specify and Provide details
-
9. Clean Up required
•Clean Up
-
Specify and Provide details
-
Take Relevant Photo
-
10, Check isolation points accessible, record asset numbers and photograph
•Isolation Point
-
Specify and Provide details
-
Take Relevant Photo
Signatory
-
Prepared By: (Full Name and Signature)