Title Page
-
Document No.
-
Audit title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
SDM Arrival on site
-
1. Was the site safe, secure and gates locked?
-
2. Did you observe good/safe working practices?
-
3. Were all contractors wearing the correct PPE?
-
4. Was the site induction suitable and sufficient to identify all hazards and risks?
H&S Folders
-
5. Are both Health and Safety folders on site?
-
6. Is the front page of both folders signed by the H&S officer?
Contractor H&S Notice Board
-
Does the H&S notice board have the following documents and are they in date and relevant to the Site Manager: (inc photo)
-
7. Employers liability certificate?
-
8. Fire action plan?
-
9. Site rules?
-
10. Local hospital information and map?
-
11. Asbestos certificate?
-
12. Health and Safety policy statement?
-
13. SMSTS/SSSTS certificate?
-
14. First Aid certificate?
Contractors Induction
-
15. Have all contractors signed In/Out correctly in folder 1?
-
16. Have all contractors signed In/Out correctly on the store signing in sheet, declared a “6” and been searched?
-
17. Have all contractors had a site induction and are the forms signed?
-
18. Has a young persons risk assessment been completed for anyone under 18 working on site?
-
19. Have all contractors read the asbestos report and “Contractor Signing Page” (Appendix 4)?
H&S Documents
-
20. Is there a current copy of a relevant CSCS card for every contractor?
-
21. Do all contractors have a current Asbestos awareness certificate?
-
22. Are all contractors RAMS in date, relevant and signed?
-
23. Are all contractors Indemnity insurance certificates present, in date throughout the project and for £10m Employers liability?
-
24. Do all contractors hold relevant and valid certificates to use specialist equipment?
-
25. Is there an F10 on display if required?
Project Details
-
26. Has the site Manager/Supervisor been briefed on the project and have copies of the following?
-
27. Scope of works?
-
28. Programme of works?
-
29. Pre-construction phase plan?
-
30. As built drawing (showing storage area)?
-
31. Signed off drawing?
Specification
-
32. Is the current Screwfix spec manual (Rev.13) in the folder?
-
33. Is the current Electrical spec manual (Rev.S) in the folder?
-
34. Is the current ADT Playbook (Rev. 2.4) in the folder?
Site set up
-
35. Is the Daily Hazard board displaying relevant up to date information?
-
36. Is there a designated assembly point?
-
37. Is the accident book available?
-
38. Have all contractors power tools and chargers been PAT tested?
-
39. Are there adequate fire procedures in place including - Fire Bell, Fire signage and Fire extinguishers?
-
40. Are the Fire extinguishers in date?
-
41. Is there suitable/sufficient barrier fencing and signage around the skip?
-
42. Is there suitable/sufficient barrier fencing and signage around any working areas?
-
43. Is there suitable/sufficient barrier fencing and signage around the storage area?
TC forms
-
44. Is the store signing in sheet being filled in correctly with the dice procedure being followed?
-
45. Is the hourly Health and Safety check form being completed by the TC management team?
Completion
-
46. Any additional comments?
-
SDM
-
Site Manager
-
Duty Manager