Title Page

  • Document No.

  • Audit title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

SDM Arrival on site

  • 1. Was the site safe, secure and gates locked?

  • 2. Did you observe good/safe working practices?

  • 3. Were all contractors wearing the correct PPE?

  • 4. Was the site induction suitable and sufficient to identify all hazards and risks?

H&S Folders

  • 5. Are both Health and Safety folders on site?

  • 6. Is the front page of both folders signed by the H&S officer?

Contractor H&S Notice Board

  • Does the H&S notice board have the following documents and are they in date and relevant to the Site Manager: (inc photo)

  • 7. Employers liability certificate?

  • 8. Fire action plan?

  • 9. Site rules?

  • 10. Local hospital information and map?

  • 11. Asbestos certificate?

  • 12. Health and Safety policy statement?

  • 13. SMSTS/SSSTS certificate?

  • 14. First Aid certificate?

Contractors Induction

  • 15. Have all contractors signed In/Out correctly in folder 1?

  • 16. Have all contractors signed In/Out correctly on the store signing in sheet, declared a “6” and been searched?

  • 17. Have all contractors had a site induction and are the forms signed?

  • 18. Has a young persons risk assessment been completed for anyone under 18 working on site?

  • 19. Have all contractors read the asbestos report and “Contractor Signing Page” (Appendix 4)?

H&S Documents

  • 20. Is there a current copy of a relevant CSCS card for every contractor?

  • 21. Do all contractors have a current Asbestos awareness certificate?

  • 22. Are all contractors RAMS in date, relevant and signed?

  • 23. Are all contractors Indemnity insurance certificates present, in date throughout the project and for £10m Employers liability?

  • 24. Do all contractors hold relevant and valid certificates to use specialist equipment?

  • 25. Is there an F10 on display if required?

Project Details

  • 26. Has the site Manager/Supervisor been briefed on the project and have copies of the following?

  • 27. Scope of works?

  • 28. Programme of works?

  • 29. Pre-construction phase plan?

  • 30. As built drawing (showing storage area)?

  • 31. Signed off drawing?

Specification

  • 32. Is the current Screwfix spec manual (Rev.13) in the folder?

  • 33. Is the current Electrical spec manual (Rev.S) in the folder?

  • 34. Is the current ADT Playbook (Rev. 2.4) in the folder?

Site set up

  • 35. Is the Daily Hazard board displaying relevant up to date information?

  • 36. Is there a designated assembly point?

  • 37. Is the accident book available?

  • 38. Have all contractors power tools and chargers been PAT tested?

  • 39. Are there adequate fire procedures in place including - Fire Bell, Fire signage and Fire extinguishers?

  • 40. Are the Fire extinguishers in date?

  • 41. Is there suitable/sufficient barrier fencing and signage around the skip?

  • 42. Is there suitable/sufficient barrier fencing and signage around any working areas?

  • 43. Is there suitable/sufficient barrier fencing and signage around the storage area?

TC forms

  • 44. Is the store signing in sheet being filled in correctly with the dice procedure being followed?

  • 45. Is the hourly Health and Safety check form being completed by the TC management team?

Completion

  • 46. Any additional comments?

  • SDM

  • Site Manager

  • Duty Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.