Audit
1. Completed building permit application
2. Approved site / location plan included
3. Site address and lot number
4. Property owner contact information.
5. Design professionals contact information
6. Building use description
7. Occupancy classification (IBC 302.1)
8. Number of occupants calculated (IBC 1004)
9. Egress width calculations
10. Building construction type and fire protection info
11. List of effective codes for design and construction
12. Special inspections required
13. Statement of special inspections
14. Building height and area modification calculations
15. Georgia energy code compliance report
16. Signature / stamp of design professional
17. Reviewed by Fire Marshall
18. Occupancy separation
19. Building required to be sprinklered
20. Fire resistance rating
21. Fire walls required
22. Rated wall & floor/ ceiling assembly penetrations
23. Required Opening Protective Ratings
24. UL® or similar specific design details
25. Incidental use areas
26. Soil classification and investigation
27. Without soils report-assume capacity of 1,500 psf
28. Footings and foundation designs
29. Engineered truss design plans
30. Wood joists and rafter design standards
31. Structural design summary included
32. Minimum number of plumbing fixtures
33. Wall materials surrounding fixtures
34. Drinking fountains
35. Plumbing supply- minimum size, including riser
36. Plumbing drainage- minimum size, including riser
36. Cleanouts shown on plans
37. “Safe waste system” required
38. Trap primers as required
39. Roof drain locations and sizing
40. Roof drain locations and sizing
41. Access to HVAC equipment on roofs
42. Source of heat verified
43. Required outdoor ventilation air
44. Exhausts in toilet rooms & similar spaces
45. Outdoor air intake and exhaust outlet locations
46. HVAC details
47. Details of the gas piping system
48. Venting of fuel burning appliances details
49. Boiler and water heater- required separation
50. Single line electrical diagram
51. Location of equipment and panels
52. Panel schedules
53. Method of grounding and bonding
54. All motor disconnects are identified
55. GFCI receptacle locations
54. Transformer location and required separation
55. Electrical load calculations
56. Exit signs & emergency/means of egress lighting
57. Working areas, egress, etc provided
58. Elevator lobby requirements
59. Fire separation of tenant spaces and corridors
60. Fire suppression system for commercial hoods
61. Accessibility requirement for existing buildings
62. Details provided for accessible restrooms
63. Handicapped parking requirements
64. Accessible route is provided
65. Smoke & audio/visual alarm systems
66. Required stairway width
67. Means of egress and exit discharge illumination
68. Exit doorways
69. Number of exits required
70. Exit access travel distance
71. Corridor construction
72. Fulton County sewer pre-treatment approvals
73. Fulton County Food Service approvals
74. Georgia Department of Agriculture approvals
Notes