Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Project No:
-
CIZ No.
-
Catchment:
-
Sub Catchment:
1. Onsite Construction Documentation
-
All Plans/Permits valid and onsite - ie. Up-to-date IFC drawings, DBYDs
-
SWMS relevant for specific site and activities
-
Excavation Permit
2. Construction Plant, Materials and Equipment
-
Daily pre-start checklists completed for all plant
-
All materials, equipment, machinery and work vehicles kept within construction zone
-
Pipes and fittings conform to spec and are in new condition (refer to std drawings SEW_PSS_004/8)
-
Min PN16/SDR11, PE 100 and 316 SS Fittings
-
Valve is clockwise closing
3. Service Location and Protection
-
All known existing services have been located and proved prior to work commencing
-
Minimum clearance maintained as per WSA 07-2007 or WSA 02-2002
4. Traffic Management
-
Traffic management set up suitably for site.
-
Sufficient traffic management and signs around excavation
-
Signs set up at all entrances towards work site location
5. Establish Environmental Controls
-
Silt fencing and traps employed where required
-
Parawebbing erected around protected trees/vegetation
6. Construction
-
Spoil stored correctly or removed from site
-
Ensure correct fittings and pit covers are used (Trafficable or non Trafficable)
-
Adequate fall from heights protection installed where required
-
Outside of pipe is scraped down and cleaned with isopropyl wipes prior to electro fusion jointing
-
No water present while welding is in progress
-
Valve shroud is compacted with crushed rock
-
Tracer wire connected to wire from bored pipe and placed in an accessible location inside the shroud
-
Isolation valve constructed as per Standard Drawing SEW_PSS_003
NOTES AND COMMENTS
South East Water Representitive
-
Add signature