Title Page
-
CMS003 Telehandlers MS V3
-
Project
-
Location
-
Form Completed By
-
Date / Time
Planning, Documentation and Records
-
Are all persons involved in lifting operations trained and competent?
-
Are lifting equipment & accessories currently tested, certified and have an in date statutory inspection?
-
Has a lifting plan been issued & accepted with all involved in the lifting operation briefed and signed onto the lift plan?
-
Have CBR / Plate Bearing Tests / Max Floor Loadings been carried out and the results assessed by a competent person to confirm the ground conditions are suitable for the lifting operation?
-
Do the ground conditions look suitable for the lifting operation?
Lifting Operation
-
Are the lifting team following their SSOW & Lift Plan?
Sign Off
-
Inspection carried out by
Additional Attendees to Inspection
-
Additional attendees to inspection