Title Page
-
Site conducted
-
Conducted on
-
Conducted by
Shipping, Chiller and associated areas
Dispatch Area
-
Key pad working and door closing securely
-
Dispatch Doors closed and sealed tightly if not in use ?
-
Area clean and tidy ?
-
Robot packing area clean and tidy?
-
shadow board full and in good condition
-
PC area lean and tidy no cups or food in area
-
Export packing area clean and tidy (i.e. no stickers on machine, rubbish on floor or bottles in area)
Dry goods area
-
Area clean and tidy?
-
Door closed and sealed
-
Floors swept
-
No Incorrect utensils in the area
Chiller
-
Door to chiller closed and undamaged
-
Data logger working
-
Area clean and tidy
Freezer
-
Door to freezer closed and undamaged
Turning Area
-
Area clean and tidy
-
Doors closed
-
Orange Bin Lid closed
-
Roller door closed and sealed
-
Unfit covered and labelled
Link Corridoor
-
Door closed
-
All rubbish placed in compactor
-
Link Corridor is clean and tidy
-
Chemical Store doors closed
-
Chemical store clean and tidy
-
All doors in link corridor to exterior fully sealed
Old block Packing
-
Area Clean and tidy
Staff facility's and interior rooms
-
Stairs leading to staff toilets clean and tidy
-
Staff Male Toilets Clean and tidy (Photo only to be taken when facility vacant)
-
Staff Female Toilets Clean and tidy (Photo only to be taken when facility vacant)
-
Corridor to Lab and changing rooms clean and tidy
-
Cloakroom Corridor Clean and Tidy
-
Culture Freezer room Clean and tidy
-
Staff Canteen Kitchen Clean and tidy
-
Staff Canteen seating area clean and tidy ?
-
Canteen Fridges Clean both?
-
Driver Toilet Clean and tidy
<br>