Title Page
-
Property & Client
-
Conducted on
-
Prepared by
-
Location
-
Service Visit Type
-
Plant Description
-
Asset Reference
RAMS
-
Risk assessment completed
-
Method statement completed
-
PPE
-
Engineer Initials
SFG 20 Procedure
Inspection Checks
-
Open the purge valve on the unit to release the pressure and partially drain
-
Where filters are fitted, the secondary cartridge filter or bag filter should be cleaned or replaced
-
Magnetic rod cleaned
-
When fluid runs clear with no visible particles, close purge valve, refill system and vent off any trapped air.
Additional Comments
-
Report of any faults
Safety Checks
-
Inspection Completed
-
Area left safe
-
Area left clean
Polyteck Building Services, 143 Leman Street, London, E1 8EY
-
Engineer Signature