Title Page

  • Property & Client

  • Conducted on

  • Prepared by

  • Location

  • Service Visit Type

  • Plant Description

  • Asset Reference

RAMS

  • Risk assessment completed

  • Method statement completed

  • PPE

  • Engineer Initials

SFG 20 Procedure

Inspection Checks

  • Open the purge valve on the unit to release the pressure and partially drain

  • Where filters are fitted, the secondary cartridge filter or bag filter should be cleaned or replaced

  • Magnetic rod cleaned

  • When fluid runs clear with no visible particles, close purge valve, refill system and vent off any trapped air.

Additional Comments

  • Report of any faults

Safety Checks

  • Inspection Completed

  • Area left safe

  • Area left clean

Polyteck Building Services, 143 Leman Street, London, E1 8EY

  • Engineer Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.