Title Page

  • Site conducted

  • CDM REPORT NO

  • Project

  • Project No

  • Conducted on

  • Site Manager

  • Site Inspector

  • Address

01 Documentation

F10

  • Visible

  • Dates

  • Signed

Insurances

  • Public

  • Employer

Contractors MS/RA

  • On Site

  • Approved

  • Operation

Site Register

  • On Site

  • Being Used

  • Spare Pages

Induction Book

  • On Site

  • Being Used

Site H&S File

  • Inspections

  • Accidents

  • Permits

02 Security

External

  • Stores & Materials

  • Compound

  • Site Entrance

Internal

  • Building Manager

  • Internal Security

  • External Security

03 PPE

  • Operatives

  • Visitors / Spare

  • Inspection Checks

04 Protection including others

  • General Public

  • Building Staff

  • Specify

05 Access / Egress

  • Site Entrance

  • Compound Entrance

  • Escape Routes

06 Signage

General

  • Details

First Aid

  • First Aider Named

  • Location of Box

  • General

Warning

  • Details

Mandatory

  • Hard Hats

  • Hi Viz

  • Safety Boots

  • Noise

  • Permits

  • Other

Danger & Prohibition

  • Details

Other

  • Deliveries

  • Marketing Board

  • Site Office

07 Fire Routes & Precautions

Routes

  • Fire Routes & Precautions

  • Routes

  • Temporary Direction

  • Permanent Direction

  • Crown Fire Plan

Extinguishers

  • Foam

  • CO2

  • Water

  • Powder

  • In Date

  • Test Certificate

  • Meter Green

  • Weighed (CO2)

Warning

  • Details

08 Site Management

  • Project Manager

  • Site Manager

  • Site Foreman

09 First Aid

First Aider

  • Name

  • Qualification

  • Sticker

Box Location

  • In office

Adequate Resource

  • Plasters

  • Eye Pads

  • Bandages

  • Dressings

  • Gloves

  • Wipes

10 Emergency Procedures

Fire

  • Building Procedures

  • company Procedures

  • Fire alarm deactivated

  • Air horn in use on site

Medical Assistance

  • Details

Other

  • Terrorist threat

  • COMAH

  • Environmental

11 Accidents

  • HSE data compliant book

  • Accident investigations

  • Accidents reported

  • RIDDOR 2508

12 Materials Storage

Internal

  • Safely Stored

  • Segregation

  • COSHH

External

  • Safely Stored

  • Segregation

  • COSHH

13 Electricity

  • Lighting

  • Power tools

  • Transformers

  • Pat Tested

  • RCD Used

  • 110v / 240v

14 Housekeeping

  • Generally

  • Specific

15 Hazardous Materials

  • Known Asbestos Sample<br>

  • Asbestos Survey Type

  • Type 1

  • Type 2

  • Type 3

  • Lime based products

  • Specify Other

  • Chemical/Gaseous

  • Specify Other

  • COSHH Risk Assessment and Safety Data Sheet contained in Site Health & Safety File

16 Working at Height/ Scaffolding

    SA1 Scaffold Erections
  • Basic Description

  • Location

  • Scaff Tag

  • Single Report

  • Result

  • Hazards Identified

  • SA2 Mobile Access Towers
  • Location

  • Type

  • Result

  • Hazards Identified

  • SA3 Stepladders
  • Location

  • Type

  • Result

  • Hazards Identified

  • Health and safety Issues identified from work at height inspections

17 Excavations

  • Trenches

  • Holes

  • Other

18 Manual Handling

  • Select

  • Details

19 Demolition

  • Details

20 Welfare Facilities

  • Select

21 Confined Spaces

  • Select

22 Permit to Work

  • Select

  • Specify

23 Noise

  • Noise metre on site

  • Client noise levels agreed

  • Time restrictions

  • 1st Action Level 80db

  • 2nd Action Level 85db

  • Peak Action Level 200pcl

24 Welding, Brazing and Gas Cutting

  • Select

  • Specify

  • Specify

25 Plant and Machinery

  • Cherry Picker

  • Status

  • MEWP

  • Status

  • Telehandler

  • Status

  • Other

  • Status

26 Environmental and Waste Disposal

  • Asbestos Disposal Required

  • Asbestos Removal Clean Air Cert Inspected

  • Use of Skips for Construction Debris

  • Gypsum Content of Plasterboards Deemed as Controlled WR

  • General Discharge of Effluents into Controlled Water Sources

  • OTHER ENVIRONMENTAL CONCERNS

27 Health and Safety Manager’s Follow up Actions

    ACTIONS
  • Details

Additional Detailed Report

  • 1 To be rectified within 24 hours.

  • 2 To be rectified within 3 days.

  • 3 To be rectified within 7 days.

  • 4 To be rectified when practical.

  • All the items listed in red are for the remedial attention of the site manager and are based on the health and safety manager’s observations at the time of the inspection. If items are displayed in red, the site manager is to speak to the H&S manager on guidance to allow for rectification of the problem.

  • ARE THE SITE H&S MEETINGS BEING CONDUCTED?

  • ARE TOOLBOX TALKS BEING GIVEN?

  • ARE IDENTIFIED HAZARDS BEING RECTIFIED?

  • This report includes the mandatory inspection of working platforms above two metres (section 16) and must be held on site in the site H&S file. These reports will be held electronically for a period not less than 3 months as required by the work at height regulations 2005.

  • I confirm that all items and observations made on this report are accurate and have been made at the time stipulated on the report.

  • Date and time of Inspection

  • Site Manager Present

  • Name and Signature of Auditor

  • Position

  • Time of Section 16 Inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.