Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
YES means item is excellent or acceptable. NO means item is unacceptable. If NO is selected photos and comments MUST be provided. A total of 1 point per line item that is granted a YES. Points are to be tallied and entered at the end of the report
Corrective Action Review
-
Review the previous inspection report and answer the following questions. Note: if a corrective action task has NOT been completed by the review date a CORRECTIVE ACTION REPORT must be completed along with this report.
-
Have all items requiring corrective action been completed by the specified due date on the previous inspection report? If the answer is NO enter a brief description of what has not been completed. Once this report has been finalised proceed to create a Corrective action report.
Car parks
-
Clean and presentable
Gardens
-
Clean and presentable
External walkways
-
Clean and presentable
External walls
-
Clean and presentable
Loading Bay Area
-
Clean and presentable
Refuse areas
-
Clean and presentable
Entrances
-
Clean and presentable
Height accessible areas
-
Clean and presentable
Internal walkways
-
Clean and presentable
Internal walls
-
Clean and presentable
Toilets
-
Clean and presentable
Lifts
-
Clean and presentable
Travelators
-
Clean and presentable
Fire hose cupboards and Panels
-
Clean and presentable
Corrective Action
-
Review the items that require corrective action and briefly list here
-
Name the staff remember who is responsible for to carry out this corrective action. If multiple people are included itemise the specific task relating to each person requiring corrective action
-
Enter a date when all items requiring corrective action must be completed by
-
Enter a date when an inspection will be carried out to confirm whether or not the items requiring corrective action have been completed
Review and conclusion
-
Do you have any notable comments
Additional site item review & recommendations
-
Item
-
Details
-
Add media
-
Risk Rating
-
Details of risk
-
Recommendation
-
Item
-
Details
-
Add media
-
Risk Rating
-
Details of risk
-
Recommendation
-
Item
-
Details
-
Add media
-
Risk Rating
-
Details of risk
-
Recommendation
-
Item
-
Details
-
Add media
-
Risk Rating
-
Details of risk
-
Recommendation
-
Item
-
Details
-
Add media
-
Risk Rating
-
Details of risk
-
Recommendation
-
Item
-
Details
-
Add media
-
Risk Rating
-
Details of risk
-
Recommendation
-
Item
-
Details
-
Add media
-
Risk Rating
-
Details of risk
-
Recommendation
-
Item
-
Details
-
Add media
-
Risk Rating
-
Details of risk
-
Recommendation
Signatory
-
I hereby acknowledge this report to be a fair and accurate reflection of the inspected site.