Information

  • DA/CDC/CC Number

  • Client / Site

  • Location
  • Conducted on

  • Health and Building Surveyor

1. Ongoing Matters

  • 1.1. Builders's sign

  • 1.2. Sediment and erosion controls

  • 1.3. Rubbish control

  • 1.4. Builder's toilet

2. Health and Building Surveyor's Checklist

  • 2.1. Record on plans

  • 2.2. Plumber on site

  • 2.3. Licensed plumber

  • 2.4. Application paid for

  • 2.5. In accordance with approved plan

  • 2.6. Under-water test

  • 2.7. Location in relation to footings/slab

  • 2.8. Location of tank in relation to building

  • 2.9. Within boundary of allotment

  • 2.10. Not in easements

  • 2.11. Filled ground

  • 2.12. Correct grade

  • 2.13. Sufficient cover/depth

  • 2.14. Separation from other services

  • 2.15. Approved material

  • 2.16. Bedding, side support, overlay

  • 2.17. Jointing and direction of laying

  • 2.18. Soffit requirements

  • 2.19, connection of all internal pipes (check recorded layout)

  • 2.20. Gully height of finished ground level/floor level

  • 2.21. Number of gullies

  • 2.22. Venting

  • 2.23. Concrete base support - gully

  • 2.24. Provision of inspection openings

  • 2.25. Surface water diversion drains

  • 2.26. Absorption trench/length - check soil percolation test results

  • 2.27. Irrigation lines/signage

  • 2.28. Landscaping

  • 2.29. AS 1547 stamped tank

  • 2.30. Sticker left

3. Comments

  • 3.1. Result

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.