Information

  • DA/CDC/CC Number

  • Client / Site

  • Location
  • Conducted on

  • Health and Building Surveyor

1. Health and Building Surveyor's Checklist

  • 1.1. Check plan against building

  • 1.2. Smoke alarms installed

  • 1.3. Operation of doors/windows

  • 1.4. Plumbing fixtures operate

  • 1.5. Water hammers

  • 1.6. Check for leaks

  • 1.7. Secure fixtures

  • 1.8. Grading of tiled floors

  • 1.9. Shower screen

  • 1.10. Adequate water pressure

  • 1.11. Cooking facilities installed

  • 1.12. Painting - external/internal

  • 1.13. Water meter and box

  • 1.14. Surface water inlet sumps - low areas

  • 1.15. House number

  • 1.16. Retaining walls

  • 1.17. Access/layback

  • 1.18. Compliance with Building Approval conditions

  • 1.19. Termite Certificate

  • 1.20. Wet Area Flashings Certificate

  • 1.21. Mechanical exhaust ventilation (to enclosed WC, bath, laundry, kitchen)

  • 1.22. Manhole access to roof space/underfloor access door

  • 1.23. Railings/balustrades to landings > 1000mm

  • 1.24. Electricity connected

  • 1.25. Water connected

  • 1.26. Sanitary drainage connected

  • 1.27. Sewer/Drainage Diagram Received

  • 1.28. All building waste removed

  • 1.29. All builders sheds etc removed

  • 1.30. Hot water heater support and overflow

  • 1.31. Septic tank/AWWTS (check approval conditions)

  • 1.32. Height of floor/ground level

  • 1.33. Finished ground graded away from the house

  • 1.34. Height of overflow gully

  • 1.35. Coping to gully and inspection shaft

  • 1.36. Flashing of roof penetrations

  • 1.37. Landings to external doors

  • 1.38. Stormwater discharge

  • 1.39. Grated drain to front of garage

  • 1.40. Council's services exposed/undamaged

  • 1.41. All structural certificates received

  • 1.42. Essential Services Certificate

  • 1.43. Builder/owner - on site/contacted

  • 1.44. DA Conditions

  • 1.45. Previous Inspections

  • 1.46. Tempered water test (below 50 degrees Celsius) for all areas except kitchen sink and laundry

  • 1.47. Compliance with Development Approval conditions

  • 1.48. Final survey detailing boundary and eaves setbacks (if required by Conditions of Approval)

  • 1.49. Contribution/Headwork Charges

  • 1.50. Conditions check and signed off by planner, Engineer and Environmental Health and Building Surveyor

2. Comments

  • 2.1. Occupation

  • 2.2. Result

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.